| 1245 | After some MIDAS tests, retake control and check pulses. DIB1 pA, DIB2 pA, and DIB3 pD all railed. Adjust Driver Offsets. |
| 1309 | Start test background series with standard setup at 0/0 V with FG=5/2/5, OG=3, with 1000 initial randoms, 0 ending randoms, no flash. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window. Stop after initial randoms are done. |
| 1325 | Unpower DCRC50, detach PiFilter connector, and attach Pi Filter switch board. Switch on filters for all phonon channels, so that the only channels not filtered are pins: 42, 26, 11, 27, 12, 30, 15, 31, 16, 50, 45, 46, 49. Repower DCRC50 and zap SQUIDs. |
| 1459 | Start test background series with shielded pi-filter board attached to DIB3 with all phonon lines filtered at 0/0 V with FG=5/2/5, OG=3, with 1000 initial randoms, 0 ending randoms, no flash. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window. Stop after initial randoms are done. |
| 1510 | Power off DCRC50 and switch on only Charge-related pi-filter switches, and leave all other lines unfiltered. Filtered lines are: 11, 27, 12, 30, 15, 31, 16, 50. Repower DCRC50 and zap SQUIDs. |
| 1600 | All phonon channels look good after adjusting Driver Offsets. |
| 1602 | Start test background series with shielded pi-filter board attached to DIB3 with all charge lines filtered at 0/0 V with FG=5/2/5, OG=3, with 1000 initial randoms, 0 ending randoms, no flash. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window. Stop after initial randoms are done. |
| 1610 | Power off DCRC50 and detach pi-filter switchboard, attach DSUB pi-filter connector and repower DCRC50. |
| 1615 | Commence LHe transfer (26.1%). |
| 1700 | Cease LHe transfer (87.2%). Zap SQUIDs. |
| 1715 | Release Pressure from Main Bath. Fill LN2 cold trap full. |
| 1720 | Check phonon traces. DIB3 pA railed. Adjust Driver Offset. All channels showing pulses. |
| 1735 | Start 14 hours of 30min Y-Be series at -4/+4 V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown in between series. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window. |
| | Place strong 88-Y source inside Be disc source holder. |