| | Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50 |
| | Taking Y-88 data overnight. Last flash at 12:17. |
| 1345 | Tower/MC(H35)/MC sensor/Cold Plate = 31.4/25.9/40.4/158 mK, Still = 1.27 K / 0.12 mbar, G1/G2 = 170/150 mbar, 1K Pot = 1.72 K / 18 mbar, Main bath = 57.5% |
| 1350 | Measure main bath level with thumper. At 56.9%, LHe level is 75.7 cm below top of fill port. |
| 1410 | Begin LHe transfer at 56.2% |
| 1415 | Fill LN2 cold trap Dewar. Storage Dewar ran dry. |
| 1439 | End LHe transfer at 91.1% |
| 1515 | Checking phonon channels: all OK. Some low-f noise seen, let some pressure out of cryostat. |
| 1525 | Start 16 hours of 30min 88-Y series at -4/+4V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, 30s flash and 25 minute cooldown before series. Trigger on DIB1 phA with threshold of 30ADC bins. |
| 1550 | Fill LN2 cold trap Dewar again, after refilling storage Dewar. |