| | Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50 |
| | Idle overnight, DCRCs powered. Mu-metal shield lowered into pit so that cryostat is no longer shielded magnetically. |
| 0855 | Tower = 31.5 mK, Still = 0.090 mbar, G1/G2 = 125/120 mbar, 1K Pot = 1.54 K / 3.8 mbar, Main bath = 70.7% |
| 0900 | Fill LN2 cold trap Dewar |
| | Prepare to warm tower above Al transition temperature of 1.2 K then cool again, with mu-metal shield lowered. |
| 0950 | Close V6, to stop circulation. G1/G2 fall, P1 rises, Tower temperature rises. |
| 0955 | Tower = 270 mK and rising, Still = 5.5 mbar and rising, G1/G2 = 65 mbar and falling. |
| 1010 | Tower = 400 mK and rising slowly, Still = 20.0 mbar and rising, G1/G2 = 35 mbar and falling. |
| 1020 | Close V13a V13b (?) and turn off 3He circulation pump, to isolate pump |
| 1025 | Apply 1000 μW power to MC heater. Tower starts to warm more quickly. |
| 1030 | Tower = 675 mK and rising, Still = 400 mbar and rising quickly, G1 = 20 mbar and settling, G2(pump pressure) = 30 mbar and settling. |
| 1035 | Open V14 to release still pressure into dump. Still pressure peaked at 950 mbar, fell quickly to 110 mbar. |
| 1040 | Close V14 again to isolate dump. P1 has settled at about 60 mbar - this is pressure of 3He in dump. |
| 1045 | Tower/MC(H35)/MC sensor = 1.22/1.32/1.68 K. Still = 170 mbar and rising. |
| 1055 | Open V14 again because still pressure has risen to 950 mbar. |
| 1105 | P1 fell to 300 mbar but then rose to max (1000 mbar). Open v9 and close again to check dump pressure on G2, inconclusive. Try again with pump on. Each time when V9 is opened, G2 falls a little. This suggests that there's less than 25 mbar of pressure in the dump. Will leave V14 open and not worry that P1 is maxed out. |
| 1110 | Tower/Cernox/MC(H35) = 1.62/1.68/1.84 K. Agreement between Tower (U02844) and Cernox thermometers is pretty good indication that the tower/crystal are above the 1.2 K Al superconducting transition. |
| 1116 | Unexplained incident: Tower dropped by 0.2 K, G2 fell (very strange - this is the isolated pump), G1 rose, P1 fell to 300 mbar then rose back to max. Then tower temperature continues to increase. |
| 1145 | Tower/Cernox/MC(H35) = 1.67/1.69/1.86 K |
| | Detector has warmed above the Al transition temperature of 1.2 K. Begin to cool fridge back to base. |
| 1150 | Turn off MC heater |
| 1155 | Close V14, turn on 3He circulation pump, open V13B, open V6 to 12% |
| 1200 | Increase V6 to 13.5%, G1/G2 start to rise, to about 100 mbar in 10 minutes |
| 1210 | Increase V6 to 14.0%, G1/G2 rise more. |
| 1215 | Still pressure drops into readable range, falls quickly to below 100 mbar. G1/G2 max at 400 mbar, begin to fall. Tower temperature begins to fall. |
| 1217 | Increase V6 to 14.5%. Tower = 1.36 K |
| 1220 | Fill LN2 cold trap full. |
| 1220 | Tower = 1.19 K, Still = 3.2 mbar, G1/G2 = 360 mbar and falling |
| 1235 | V6 now open 100% |
| 1245 | Tower = 305 mK, Still = 0.15 mbar, G1/G2 = 200 mbar and steady. 1K Pot = 1.53 K / 3.2 mbar, rose briefly when circulation restarted but has mostly been steady. |
| 1255 | Tower = 78 mK, Still = 0.12 mbar, G1/G2 = 185/170 mbar |
| 1257 | Open v14 to let mixture from dump into circulation. G1/G2 don't rise much. P1 peaks at 14 mbar then falls again. |
| 1255 | Tower = 44 mK, Still = 1.7 mbar (v14 open), G1/G2 = 170/155 mbar |
| 1325 | Still = 0.5 mbar, so most of the mixture is out of dump and into fridge. Close v14. |
| 1445 | Check phonon channels. Have to adjust Driver Offsets to unrail them, but after that they're all good. Some ~330Hz noise is visible on a few of the DIB1 channels, but not as bad as yesterday. |
| 1505 | Tower = 31.3 mK, Still = 0.090 mbar, G1/G2 = 145/135 mbar |