| 1235 | After grappling with some slow-computer issues, all channels are alive and showing pulses. |
| 1320 | Start one 30min background series at -4/+4 V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window. |
| 1430 | Lower mu-metal shield 23.2 cm below its standard height. (Standard position is marked by red tape on cryostat, bottom edge of tape = top edge of shield). |
| | Begin warming tower above 1.2 K |
| 1435 | Close V6 to stop circulation. Tower → 0.2 K, G1/G2 → 50 mbar, P1 → 4.5 mbar |
| 1440 | Close V13B and turn off 3He pump. |
| 1445 | Turn on MC heater to 1 mW. Currently Tower = 0.35 K. Begins to warm more quickly. |
| 1450 | Still (P1) has risen to 38 mbar. Condenser (G1) has fallen to 15 mbar. Open V3. P1 rises a little and G1 falls a little. So apparently condenser pressure was higher. |
| 1500 | Still (P1) = 450 mbar, Condenser (G1) = 16 mbar. Both are rising. But these are actually the same pressure, V3 open, so P1 of course reads too high at this pressure. |
| 1507 | Tower = 1.0 K |
| 1530 | Still (P1) = “1000” mbar, Condenser (G1) = 23 mbar. |
| 1536 | Commence LHe transfer (51.5%). |
| 1540 | Tower/MC(H35)/MC(Cernox) = 1.63/1.80/1.65 K |
| 1550 | Tower = 1.7 K. Good enough, start cooling again. Turn off MC heater. Turn on 3He pump. |
| 1555 | Close V3, open V13B. G1 goes up (20→35 mbar), G2 goes down (43→30 mbar). Wait for them to settle. |
| 1600 | Start circulation again, open V6 to >12%. See response at 13.4%, G1/G2 begin to rise. |
| 1605 | V6 = 13.4%, Tower/MC = 1.65/1.66 K, Still = 1000 mbar, G1/G2 = 75/75 mbar, 1K Pot = 1.48 K / 4.0 mbar |
| 1605 | Recommence LHe transfer (43.3%). |
| 1615 | Open 1K Pot needle valve a few degrees more |
| 1625 | V6 = 13.6%, Tower/MC = 1.65/1.85 K, Still = 1000 mbar, G1/G2 = 185/180 mbar, 1K Pot = 1.65 K / 24 mbar |
| 1627 | Finish LHe transfer (after changing Dewars) at 92.6% |
| 1635 | V6 = 13.8%, Tower/MC = 1.47/1.60 K, Still = 130 mbar, G1/G2 = 215/210 mbar, 1K Pot = 1.63 K / 18 mbar |
| 1640 | Release pressure from Main Bath. |
| 1655 | V6 = 14.2%, Tower/MC = 1.31/1.45 K, Still = 17 mbar, G1/G2 = 280/270 mbar, 1K Pot = 1.61 K / 14 mbar |
| 1705 | V6 = 14.6%, Tower/MC = 0.99/0.90 K, Still = 3 mbar, G1/G2 = 200/190 mbar, 1K Pot = 1.59 K / 11 mbar |
| 1710 | Fill LN2 coldtrap full. Also, top off HPGe detector LN2 dewar. This should last over the weekend. |
| 1720 | V6 = 16.0%, Tower/MC = 287/317 mK, Still = 0.7 mbar, G1/G2 = 195/180 mbar, 1K Pot = 1.57 K / 9 mbar |
| 1725 | Open V6 100% |
| 1730 | Tower/MC = 145/317 mK, Still = 0.16 mbar, G1/G2 = 170/160 mbar, 1K Pot = 1.57 K / 8 mbar |
| 1748 | Starting overnight HPGe run. Bias=3.502kV, Course/Fine Gain = 100/1?(Sketchy knob), Shaping time=6us, Output Range=+6V. DCRC X, PA trigger= 30ADC(4.6mV). |
| 1752 | Tower/MC = 40.1/31.7 mK, Still = 0.11 mbar, G1/G2 = 122/116 mbar, 1K Pot = 1.54 K / 7 mbar |
| | Opening 1K pot additional 30 degrees. |
| 1830 | Tower/MC = 38.2/28.5 mK, Still = 0.14 mbar, G1/G2 = 145/138 mbar, 1K Pot = 1.67 K / 30 mbar |
| 1835 | Place Cf source at detector height at back of fridge. |