UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160824

2016/08/24 (Wednesday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → 3.2 MHz filters → cables → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield 37.8cm below standard position
DCRCs powered overnight. Pumping on IVC with turbo pump overnight. Baked detector for 12 hours overnight, Tower at 0.4 K until 05:35.
0848 Tower/MC/Coldplate = 38.3/32.3/154 mK, Still = 1.32 K / 90 μbar, G1/G2 = 185/176 mbar, 1K Pot = 1.53 K / 5.0 mbar, MB = 74.4%.
Boiloff rate: good. Yesterday pressure was released at 5min, 30min, and 63min after a 92.0% fill.
0852 Fill LN2 cold trap full.
0900 Check phonon channels, adjust one driver offset, all have baselines around -0.6 to -0.8
0900 With DIB2 FETs turned off, Start three sets of 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1300 Check for breakdown with standard iZIP DCRC biasing.
using DIB3pD, looked for jagged “breakdown noise”. Also looked for shift in baseline
bias [V] breakdown noise baseline shift [V]
+8/-8 none +0.03
+10/-10 mild +0.08
+12/-12 moderate/high +0.26
-8/+8 none
-10/+10 none
-12/+12 none +0.01
typically baseline shift was
higher at first, then relaxed

note that in Run 54 it was observed that breakdown symptoms were worse after a flash…

1325 Flash detector for 30 seconds
1400 Tower has cooled to 38.7 mK, repeat above tests monitoring DCRC2pD:
bias [V] breakdown noise baseline shift [V]
+8/-8 slight +0.05
+10/-10 moderate/high +0.12
+12/-12 moderate/high +0.32
-8/+8 none 0
-10/+10 none
-12/+12 none +0.01
overbias to +13/-13, then
+12/-12 moderate +0.11
set back to 0/0, then
+12/-12 moderate +0.16
1430 Turn off trigger, tower, and DCRC programs on MIDAS, disconnect telnet DCRC sessions, unpower DCRCs.
1440 Set up HV mode, DIB1/2/3 → 3.2 MHz filters → nothing/disconnector board/remapping board → HVside2board → DCRC55(1)/50(3). Disconnector board has all charge lines disconnected.
1440 Tower has fallen to 37.2 mK
1445 Power up DCRC1&3 and initiate telnet sessions
1445 On ODB, disable DCRC2, and reset phonon settings on DCRC3 to apply the settings used for the same phonon channels with the previous iZIP mapping. DCRC 3D/2C/2D are now mapped to DCRC 3B/3C/3D.
previous new
channel lockpoint SQ bias QET bias lockpoint SQ bias QET bias
DCRC3B -3.72 -81.2 107 -4.5 -82.6 130
DCRC3C -1.7 -70.0 86 -2.57 -79.2 125
DCRC3D -4.5 -82.6 130 -2.76 -93.5 97.7
Don't forget to change these back if/when we revert to iZIP mode
1507 Zapping squids.
1550 Plug in 1kV power supply to HV board, set to ~0 V. Rails the three DCRC3 phonon channels. Restore these with relocks. DCRC3pB (the one that crosses ground planes) has ugly noise, high frequency with an envelope structure
1600 Apply HV while monitoring DCRC1pC. After each change in HV wait about one minute to record leakage voltage and phonon channel behavior.
HV [V] Vleak [mV] Baseline [V] noise/pulses Vcrystal [V] Baseline shift [V]
0 0 -0.75 no noise 0 0
-10 -11.6 -0.72 no noise -4.896 0.03
-15 -17.8 -0.54 noise first seen -7.168 0.21
-20 -23.9 -0.1 noisy -9.484 0.65
-25 -29.5 0.57 noisy -12.02 1.32
-15 -16.7 -0.74 no noise -7.652 0.01
-25 -30.8 0.48 noisy -11.448 1.23
-20 -23.6 -0.72 no noise -9.616 0.03
-30 -36.8 0.63 no pulses -13.808 1.38
-25 -29.8 -0.48 low noise -11.888 0.27
30 37.9 -0.2 noisy 13.324 0.55
25 30.2 -0.72 no noise 11.712 0.03
35 42.6 0.6 noisy 16.256 1.35
30 35 -0.67 no noise 14.6 0.08
40 49.5 0.63 no pulses 18.22 1.38
35 41.7 -0.53 some noise 16.652 0.22
  • As indicated in the above table, there are distinct improvements with overshooting the bias and then stepping back.
  • A baseline shift of more than 0.2 V is always accompanied with some evident breakdown noise. We could use a 0.2 V baseline shift as an indicator of breakdown.
  • Today we were able to achieve HV-mode crystal biases of -9.6 V and +14.6 V without breakdown.
1650 Switch back to setup: iZIP mode, DIB1/2/3 → 3.2 MHz filters → cables → DCRC55(1)/33(2)/50(3)
1655 Begin 12-hour bake
1734 End LN2 coldtrap full.

Next Day