2016/02/22 (Monday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50
Taking Y-Be data overnight. The dataset was begun on Saturday but not recorded in the run diary. It was taken with short trace lengths and set to 41 series. The last series was still going when I removed the source. Last flash at ~7:30.
0825 Tower/MC(H35)/MC sensor/Cold Plate = 32.2/28.8/42/153 mK, Still = 1.05 K / 0.080 mbar, G1/G2 = 120/105 mbar, 1K Pot = 1.49 K / 1.8 mbar, Main bath = 44.8%
0830 Remove Y source from fridge.
0835 Tweak 1K Pot needle valve open additional 5 degrees.
0840 Fill LN2 cold trap Dewar.
1033 Start 30min of Ba series at -4/+4 V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown beforehand. Trigger on DIB1 phA with threshold of 20ADC bins, with 150 us pileup cut window. Use shorter trace lengths as on Saturday.
1035 Place Ba source at back of fridge inside top most part of shield.
1135 Check phonon traces. All look good. Change phonon and charge trace lengths back to standard trace lengths (16384 MIDASbins on phonon traces and 8192 MIDASbins on charge traces).
1138 Start 30min of Ba series at -4/+4 V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown beforehand. Trigger on DIB1 phA with threshold of 20ADC bins, with 150 us pileup cut window. Use standard trace lengths.
1330 Check phonon traces. All look good.
1400 Perform mini IbIs on DIBs 1,2,3 in standard setup. After that, unpower DCRC50, remove DSUB pi-filter from DIB3, attach pi-filter switchboard with all filters turned on, and repower DCRC50. Zap SQUIDs.
1500 Perform mini IbIs on DIBs 1,2,3 with pi-filter switchboard with all switches turned ON attached to DIB3. After that, unpower DCRC50, remove pi-filter switchboard from DIB3, turn off all filter switches, reattach pi-filter switchboard to DCRC50, and repower DCRC50. Zap SQUIDs.
1600 Perform mini IbIs on DIBs 1,2,3 with pi-filter switchboard with all switches turned OFF attached to DIB3.
1635 Commence LHe transfer (32.7%).
1730 He gas cylinder ran empty, so swap it out to finish the transfer (and order a new one).
1745 Fill LN2 cold trap full.
1750 P2 has dropped to 1.5mbar, so open up needle valve even more.
1755 Cease LHe transfer (91.8%). P2 has settled at ~30mbar, though it will settle further over time. 1K Pot temperature is 1.739K, tower temperature is 31.5mK.
1810 Release pressure from Main Bath.
1823 Start 13 series of 30min Y-Be series at -4/+4 V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown in between series. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window. Use standard trace lengths.
1830 Place Strong 88-Y source in Be disc source holder for overnight data.

Spreadsheet of Mini-IbIs data