start › cdms › k100 › run_diary › 20150422

2015/04/22

0950 Perform Electrical check on G110. G110 housing number is PF-235-934-21 Rev 0.
Detector G110 DIB 1
date/who: 2015-04-22 MF AK
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω 125 Ω
3 4 QET B 100 to 200 Ω 128 Ω
5 6 QET C 100 to 200 Ω 81 Ω
7 8 QET D 100 to 200 Ω 73 Ω
9 chassis LED1 Rforward 8 to 9 MΩ 15 kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.005 V
chassis 9 LED1 Rreverse <1 nS closed
10 chassis LED2 Rforward 8 to 9 MΩ open
10 chassis LED2 Vforward 1.0 to 1.1 V 1.014 V
chassis 10 LED2 Rreverse <1 nS 1.5 nS
11 12 Qo-Qi 69Ω
12 11 Qi-Qo 59Ω
Detector G110 DIB 2
date/who: 2015-04-22 MF AK
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω 101 Ω
3 4 QET B 100 to 200 Ω 28 Ω
5 6 QET C 100 to 200 Ω 84 Ω
7 8 QET D 100 to 200 Ω 29 Ω
9 chassis LED1 Rforward 8 to 9 MΩ 702kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.011V
chassis 9 LED1 Rreverse <1 nS < 5 nS
10 chassis LED2 Rforward 8 to 9 MΩ 701 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.013V
chassis 10 LED2 Rreverse <1 nS closed
11 12 Qo-Qi 63kΩ
12 11 Qi-Qo 52MΩ
Detector G110 DIB 3
date/who: 2015-04-22 MF AK
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω 67 Ω
3 4 QET B 100 to 200 Ω 109 Ω
5 6 QET C 100 to 200 Ω 98 Ω
7 8 QET D 100 to 200 Ω 51 Ω
9 chassis LED1 Rforward 8 to 9 MΩ open
9 chassis LED1 Vforward 1.0 to 1.1 V open
chassis 9 LED1 Rreverse <1 nS open
10 chassis LED2 Rforward 8 to 9 MΩ open
10 chassis LED2 Vforward 1.0 to 1.1 V open
chassis 10 LED2 Rreverse <1 nS open
11 12 Qo-Qi open
12 11 Qi-Qo open

Plan: Tower assembly with Pb-210 source and Am-241 source mounted above DIB2.

1100 Install upper IVC
1130 Clean EBox feedthroughs.
1230 Attach stripline heatsink at IVC ceiling. This time we put an additional crinkled up piece of foil in the tube against the L-shaped heatsink piece. As last time we put foil tape over the large hole in the bottom, taped to IVC ceiling (gappy enough to allow gas flow through hole and from dead-end screw holes)
Missing one screw for heatsink compression onto striplines. (0x80 3/8“ stainless flathead screw). We found this screw afterward. We will put it back next time.
1300 Installed MC spool
1430 Installed lower 100 mK can (12 in*lb torque on screws)
1500 Assembled source holder with Pb-210 source and Am-241 source mounted above DIB2.
1600 Attempted to attach 30 mK can, applying standard 12 in*lb torque, but unfortunately damaged the threads in some of the holes in the spool. We used too-short screws (should have been M3-12, i.e. 12 mm long) so the screw was only in contact with a few threads at the bottom, and it ripped through them.