2015/04/20
| 1042 | Open IVC to external pressure sensor, which reads 4E-2 mbar. Mixing chamber temperature at 155 K. Add 54 mbar N2 exchange gas to IVC to aid in warming. Close off He recovery lines. |
|---|---|
| 1115 | Lower Dewar. |
| 1800 | Perform Stripline Electrical check. Results below: |
| Stripline | Bad Pins |
|---|---|
| 19 | No bad pins. No shorts to ground. |
| 20 | Qo Bias (FET Pin 21). No shorts to ground. |
| 27 | Feedback coil B, Feedback coil C, QET D Return. No shorts to ground. |