| 1000 | Disconnect ping pong ball and reconnect He Recovery hose in preparation for LN2 blowout. |
| 1035 | Commence LN2 blowout. Filling LN2 cold trap with blown out LN2. |
| | Background IVC leakrate 3.4E-8 mbarL/s. |
| 1120 | Cease LN2 blowout. IVC leak rate: 3.1E-8 mbarL/s. Turn on He3 pump to attempt throughput test. |
| 1125 | Throughput of 56mbar/min. Looking good. Pump to dump. |
| 1135 | Isolate fridge lines. And begin closing V6 to isolate mixture in the dump. |
| 1138 | Pump out Main Bath. Pump out 1K Pot. |
| 1152 | Flush the Main Bath with He gas. |
| 1405 | After trying to pull out the LN2 transfer stick for like two hours, we finally were able to pull it out. Re-flush the Main Bath with He gas since presumably a lot of it escaped since the seal wasn't maintained during the transfer stick pulling. |
| 1414 | Current mixing chamber temperature at 82 K. Commence LHe transfer (-1%). Add 4.6E-2 mbar He exchange gas to IVC. Commence cryocleaning through cold trap 2. |
| 1508 | After rising to ~85.5K, temperature has begun falling. Currently at 84.3K. |
| 1542 | MC Temp: 72K. LHe transfer tube needs a new O-Ring at the linkage. You can see that it's freezing up and even occasionally dripping LHe as seen below: |