2015/04/27

0945 Set up mini clean room
1015 Found a bad connection on the tower thermometer plug, so redid the soldering. Used a new Samtec(?) connector, since the other one had silicone on it. The connector used had posts without holes - I wrapped the wire around a few times before soldering, hopefully this is secure and stress-relieving. Taped it over with Kapton tape.
actual part used was 3M Headers & Wire Housings FULL STICK HDR/36POS - http://www.mouser.com/ProductDetail/3M-Electronic-Solutions-Division/929850-01-36-RA/?qs=VCIs6OJqWMmA2mkHtYsWPQ%3D%3D
1245 checked striplines from cold end to ebox for shorts to ground. No shorts on any pins.
1300 Installed tower
1700 During electrical checkout after attaching SQET cards, found a bad connection in Stripline 19 - the QET Bias B wire. We can probably fix this with wire-rerouting cards at SQET end and E-box end.