2015/05/27 (Wednesday)

0945 Wipe down clean room tent with isopropanol. Open IVC bottom flange. Commence tower unistallation.
1030 Tower is not centered with respect to 4K plate. It is leaning to the west and slightly south. It can be wobbled around.
1100 600mK rod does not appear to be touching either can

During uninstallation, it was noted that the SQUET/Striplines for each DIB were not recorded properly. Correct list included below:

  • East dib1 ZC-13 stripline 19
  • West dib2 ZC-70 stripline 27
  • SW dib3 ZC-23 stripline 20
1510 Place tower (double bagged) in clean room purge cabinet.