| 1115 | Disconnect scroll pump from IGH to pump out IVC pumping manifold. |
| 1120 | Pump out nitrogen line and add >1bar of nitrogen gas to IVC in preparation for opening. |
| 1125 | Fill LN2 cold trap full. Place cold traps back in bath. |
| 1135 | Open manual dump valves in preparation for cryocleaning. Current dump pressure of 668mbar. Commence cryocleaning. |
| 1330 | Finish cryocleaning. Pump to dump. |
| 1410 | Current pressures: G1: 0.1mbar, G2: 628mbar. Commence cryocleaning through Cold Trap 2 again. |
| 1602 | Finish cryocleaning mixture. Pump to dump. |
| 1635 | Mixture isolated in dump. G1: 0.0mbar, G2: 622mbar. Commence cryocleaning through Cold Trap 1. |
| 1645 | Fill LN2 cold trap full. |
| 1830 | Seal and evacuate IVC. |
| 2210 | Re-tighten bottom indium seal. |
| 2230 | Fill N2 cold trap full. |