2016/08/21 (Sunday)
| Setup: iZIP mode, DIB1/2/3 → 3.2 MHz filters → cables → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield in standard position | |
| DCRCs powered overnight. Pumping on IVC with turbo pump overnight. Yesterday's data reveals that the timing link was not working, apparently caused by the test data taken on Friday. |
|
| 1230 | Tower/MC/Coldplate = 38.7/37.1(?)/151 mK, Still = 1.26 K / 80 μbar, G1/G2 = 195/180 mbar, 1K Pot = 1.52 K / 4.0 mbar, MB = 38.2%. Boiloff rate: good |
| 1235 | Fill LN2 cold trap. |
| 1235 | Set up timing link via telnet |
| 1240 | Start short test data series at 0/0 V with DIB2 FETs off with FG=5/2/5, OG=8/3/8, with 0 initial randoms, 0 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window. |
| 1245 | Unfortunately data still shows no timing link. No plan to take data until tomorrow so we'll try to fix it then. |
| 1245 | Close V6 to begin warmup procedure. Close turbo pump valve to monitor IVC pressure. |
| 1250 | IVC = 7.4 nbar. Close 13b, turn off 3He pump, turn on MC heater to 1mW. |
| 1258 | Begin LHe transfer @ 37.3% |
| 1312 | Tower jumps 1.1 → 3.3 K. G1 reached 30 mbar minimum then began rising. |
| 1325 | Tower = 3.50K. IVC pressure = 250nbar. Begin turbopumping IVC. Turn off MC Heater to let tower start cooling. |
| 1335 | Lower mu-metal shield 48.4 cm below standard position. Tower = 3.37 K |
| 1335 | G1 peaks at 160 nbar, then falls, Tower temperature also falling |
| 1350 | 1K Pot has been falling, now 1.44 K / 4.0 mbar, and smooth. Might need to tweak it. But G1 and Tower are falling, so I'll wait. |
| 1407 | End LHe transfer (91.5%). |
| 1410 | Tower flattish at 2.17K. G1 flattish at 65 mbar. 1K Pot seems to be back to normal after finishing transfer. Turn on He3 pump, open V13B. G1/G2 stabilize at 100/105 mbar. |
| 1415 | Release pressure from main bath. |
| 1415 | Open V6 to 13.3%, G2 begins to rise. |
| 1429 | Still (P1) reaches readable levels at V6=13.7%, tower temperature at 1.44 K and G1/G2 = 320/290 mbar. |
| 1437 | Release pressure from main bath. |
| 1440 | Still (P1) reaches 1 mbar, G1/G2 = 320/290 mbar, tower temperature at 930 mK, and V6=15.0%. Open V6 fully. G1/G2 rise to 332/302 mbar, but then settle.Still reaches 0.2 mbar quickly and settles. |
| 1450 | Tower temperature at 265 mK and dropping, G1/G2 = 318/289 mbar, Still at 0.17 mbar, and 1K pot at 1.52 K/6.0 mbar and stable (oscillating on temperature plot). Leaving to go to gym while temperature continues to drop. Will return to start 12 hour bake. |
| 1552 | Back in lab. Tower temperature has reached 41.6 mK, and is still dropping. G1/G2 = 198/181 mbar, Still = 95 ubar, and 1K Pot at 1.53 K/5.5 mbar and stable/oscillating. Raise Mu metal shield. |
| Tower has been cooled below Al transition with mu-metal shield 48.4 cm below standard position. | |
| Fill LN2 cold trap full. | |
| 1600 | Starting 12 hour (43200 second) overnight bake. During bake tower temperature reached ~390 mK. |