2015/12/02 (Wednesday)

Previous Day

Status: LHe in bath, Turbo pump on IVC
0830 MC/Tower = 6.8/6.9 K. IVC pumping/isolated = 2.5/25 E-6mbar. Still/ColdPlate = 7.0/10.2 K. Sorb/1KPot = 13.0/>7 K. Main bath = 26.4%
0845 Check Trap 1 after yesterday's cleaning (now at room temperature): 11.3 mbar on G1. Open to P2: 8.0 mbar. Pump out Trap 1.
0900 Return Trap 1 to LN2 cold trap Dewar and fill LN2 cold trap Dewar
0905 Isolate IVC
0910 pump GHS contents to dump. G2 reads 791.5 mbar. Let mix into Trap 1 through V13a; G2 falls to 743 mbar.
0915 Let mix into fridge through Condenser valve, V1, and Trap 1 speedivalve.
0920 G2 has fallen to 660 mbar, G1 has risen to 600 mbar. MC temperature rises, 1KPot and Sorb fall
0935 Start LHe transfer at 23.2%
1020 MC/Tower = 6.6/6.6 K. Still/ColdPlate = 5.1/9.2 K. Sorb/1KPot = 6.5/5.4 K. G1/G2 = 530/490 mbar.
1045 Cease LHe transfer (73.2%). He gas cylinder ran dry and we don't have a spare.
1100 G1/G2 increased after transfer stopped, to 640/555 mbar.
1105 Open 1KPot needle valve 45 degrees. 1KPot temperature doesn't change much, hanging at 5.2 K. This is a little worrying.
1108 Open 1KPot needle valve wide, a full turn. Still no temperature change. Return to 45 degrees.
1112 Close V13a to isolate some of the mix in the dump (G2 = 577.6 mbar). Start pumping on 1KPot.
1115 Pot falls quickly to 2K, pressure ~ 40 mbar. G1 (condensing mixture) and MC fall quickly.
1120 1KPot = 1.71 K / 20 mbar. MC/Coldplate/Still/Sorb = 2.6/3.0/2.0/<4.0 K. G1 = 125 mbar.
1125 1KPot a bit low, 1.61 K / 7.0 mbar. Open needle valve additional 5-10 degrees. Rises to 1.66 K / 12 mbar.
1130 G1 = 72.5 mbar. Open V13a to let more mixture into fridge. 1KPot pressure goes off scale, then begins to fall again.
1135 1KPot pressure oscillating around 300 mbar, rather high - maybe it would be better to let mixture into fridge in little spurts. 1KPot at 1.83 K
1305 V12a now open 100%
1310 1KPot = 1.77 K / 40 mbar. MC = 1.9 K. G1/G2 = 50 mbar.
1310 Open still line gate valve. P1 rises off scale. 1KPot pressure spikes then oscillates, temperature oscillates. G1/G2 rise by about 10 mbar then settle. Not sure why this happens… basically just allowing mix in still to expand. Settles down after a couple of minutes, G1/G2 = 55/50 mbar.
1320 Close V9 leaving 51 mbar of mixture in dump.
1325 MC/Still/Coldplate = 1.92/1.88/2.25 K, G1/G2 = 55 mbar, 1KPot = 1.77 K / 38 mbar
1327 Start circulation: open V6 to 12%. Increase V6 in steps.
1335 At V6 = 13.2% some response seen: G2 increases to 60 mbar. Still temp goes down a little faster.
1325 V6 = 13.5%, MC/Still/Coldplate = 1.71/1.63/2.01 K, G1/G2 = 120/150 mbar, 1KPot = 1.77 K / 38 mbar
1355 Open V6 to 14%, G2 rises above 250 mbar then falls. MC cooling quickly.
1400 V6 = 14%, MC(H35)/Still/Coldplate = 1.26/1.17/1.29 K, G1/G2 = 140/170 mbar, 1KPot = 1.76 K / 34 mbar. Still pressure falls to readable range.
1420 Adjusted V6 up to 15%, no significant response. Open V6 100%
1425 V6 = 100%, Still = 1.26 K / 0.26 mbar, MC/Coldplate = 0.25/0.43 K, G1/G2 = 130/140 mbar, 1KPot = 1.76 K / 36 mbar
1425 Still = 1.07 K / 0.15 mbar, MC/Coldplate = 62/170 mK, G1/G2 = 90/95 mbar, 1KPot = 1.76 K / 34 mbar
1455 Open V14 to add the rest of the mixture from the dump into circulation. MC had fallen to 32 mK then rose after opening V14.
1640 Close V14 (after meeting), with dump (P1) down to 0.19 mbar. MC got down to 29 mK even with V14 open.
1645 Still = 1.14 K / 0.11 mbar, MC/Tower/Coldplate = 28.7/43.7/168 mK, G1/G2 = 110/110 mbar, 1KPot = 1.74 K / 28 mbar
1710 Perform electrical checkout. LEDs do not read on meter in diode mode, but when trying to do so the tower temperature spikes to ~700 mK. I guess that's how it works at so low a temperature. Otherwise checkout looks fine.
1725 Fill LN2 cold trap full.