2015/01/16

1230 Fill LN2 cold trap full.
1330 Commence pumping on IVC with turbo pump.
1705 Add about ~500 mbar He into IVC.
1715 Purge and flush the main bath. Isolate the IVC and turn off turbo pump.
1750 Commence LN2 transfer.
1830 Commence pumping on the fridge lines with the turbo pump through V2A, V5A, V7, V2, V3, V1, gate valve and condenser line speedivalve.
2100 Nitrogen level meter reads 1.32 kΩ. Nitrogen transfer complete. Attach ping-pong ball.
Mixing chamber temperature 77.6 K. Leave exchange gas in fridge to ensure close-to-uniform temperature gradient.