| 1100 | Fill LN2 cold trap full. |
| 1125 | Could not get flow during cryocleaning. Circulation pump was found to be off. It most likely tripped the circuit breaker. |
| 1130 | Recommence cryocleaning (G2 had reached 624 mbar). |
| 1237 | Pump mix to dump. |
| 1255 | G1= 0.0 mbar, P1=14 ubar, G2=638 mbar. Start cryocleaning though cold trap 2. |
| 1410 | Pump mix to dump. |
| 1455 | Finish pumping to dump. G1=0.0mbar, G2=633mbar. Isolate dump. Remove cold trap 2 from bath for cleaning. |
| 1545 | Finish first round of cold trap cleaning. |
| 1610 | Commence leak check. Background leak rate of 8.9E-10mbar*L/s. |
| | At top most IVC flange rate increased quickly to 9.2E-10mbar*L/s. Rate dropped back down after a minute. This indicates a small leak at top most flange. |
| 1620 | Leak rate oscillated around 9.0E-10mbar*L/s. No sign of a leak. Switch back to pumping on IVC with turbopump. |
| 1720 | Fill LN2 cold trap full after inserting cold trap 2. With G2=634 mbar, commence cryocleaning through cold trap 2. |