| 0945 | Cease pumping on Dewar Jacket. Pressure in dewar jacket was ~4.6E-5mbar (pumping pressure). |
| | Lower dewar the rest of the way. Install clean tent and wipe down inside with isopropanol. |
| 1050 | Open IVC to pumping manifold in preparation to fill the IVC w/ N2 gas. Pressure gauge reads >1bar. Overpressurize IVC w/ N2 gas. |
| 1100 | Open IVC and commence cleaning off visible indium. |
| 1200 | Finish removing 4K stage. |
| 1530 | Finish removing 300mK stage. A second person's needed to to remove the tower itself, so I have to wait. |
| 1710 | Place tower (double bagged) in clean room purge cabinet. |