2016/02/20 (Saturday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50
Taking Y-Be data overnight, last flash ~ 15:10.
1608 Place Y souce back in safe for transfer.
1615 Commence LHe transfer (29.3%). Fill LN2 cold trapp full.
1635 1K Pot pressure at 1.5 mbar. Turn needle valve slightly, and pressure rises to 4.0 mbar and stabilizes.
1712 End LHe transfer (91.2%).
1740 Let out pressure in main bath for ~30 seconds. Place Y source back at fridge.
Anthony restarted data and did not record it here (as usual) so below is a reconstruction after the fact:
Change trace lengths:
Phonon Charge
Samples ms Samples ms
usual 4096 3.2768 8192 3.2768
new 2048 1.6384 1024 0.4096
note: remember that in the ODB there is a factor-of-two error, you have to put in double the number of samples that you actually want.
1825 Start 41 series of 30min Y-Be series at -4/+4 V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown in between series. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window. Use shorter trace lengths as above.
Note: the final series of this data set, 07160222_0811, does not have the Y source present for most of the series - it was removed Monday morning.

Next Day