2015/08/24 (Monday)
| 0940 | Filled LN2 cold trap full. LHe 25.9%, G1/G2 = 148/141 mbar, 1K pot = 1.737K, Tower = 31mK. |
|---|---|
| 1130 | Replaced He gas tank. |
| 1315 | Commenced LHe transfer (17.9%) (note: anomalously fast boiloff, 2.2%/hour) |
| 1400 | Finished LHe transfer (95.5%) |
| 1700 | Filled LN2 cold trap full. |