UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160727

2016/07/27 (Wednesday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield at standard position
DCRCs on overnight. Baked detector for 10 hours last night. Tower temperature held at 0.4 K then fell at 1:50. Cf source on fridge for overnight activation.
0835 Tower/MC/Coldplate = 41.3/39.9/163 mK, Still = 1.39 K / 0.075 mbar, G1/G2 = 210/200 mbar, 1K Pot = 1.55 K / 5.5 mbar, MB = 73.6%
Boiloff rate good. Yesterday the main bath pressure was released at 37 min and 63 min after finishing the transfer. The second time, very little pressure was released, so probably the first release was adequate.
0840 Remove Cf source from fridge, return to safe
0845 Fill LN2 cold trap bath. No problem today with valve getting stuck. Maybe it was overfilled yesterday and now it's at an OK level/pressure.
0855 Check phonon channels, all twelve look OK
0859 Start 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window. screwed up, forgot to turn Logger on
1000 Start 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1104 Start 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1214 Start 30min background series at -2/+2 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1505 Commence baking the detector for 15 hours (until 0600 tomorrow), to once again improve phonon collection efficiency.
1720 Fill LN2 cold trap full.

Next Day