2016/04/07 (Thursday)

Previous Day

Tower installation
1055 Scotch-brite the top surface of the adapter plate on the tower again
1100 Scotch-brite bottom surface of 30mK can
1110 Begin tower installation
1145 Tower adapter plate attached and all screws torqued into 30mK can. Attach thermometer, and check that the connection is made. Lakeshore bridge should have the Tower Thermometer reading ~1kΩ. Currently reading 1.0001kΩ. Looking good.
1645 Striplines are plugged in. Performed room temperature electrical checkout at breakout box, all looks good.
Striplines may be hanging a little lower than in recent runs:
1710 After sealing IVC, did another quick electrical check at breakout box. Sadly, DIB1pB Squid Bias-Return is now reading open. Will need to investigate further.
Soudan Tower IT4
1125 Inspect 4K base of tower around pin sockets. No debris seen.
1130 Check for shorts to chassis on all sockets at 4K. None found.
IT4 Side Coaxes
Face Length ID
1 Short (position 1) ST-3-10
2 Medium (position 2) ST-4-9
3 Long (position 3) ST-5-11
4 Short (position 1) ST-3-9
5 Medium (position 2) ST-4-10
6 Long (position 3) ST-5-10
1150 Remove side coax from Face 1 of IT4. To do so first remove two round-head screws from tower side and two flat-head screws on detector side. Covered the pins with protector boards. However we won't have enough protector boards for all these side coaxes.
1155 Put IT4 back in purge cabinet.

Next Day