| 1030 | Fill LN2 cold trap full. |
| 1145 | Commence pump to dump. |
| 1436 | Closed condenser line speedivalve and gate valve. |
| 1500 | Pump and flush main bath, commence IVC leak check with background leak rate of 1.2E-9 mbar*L/s. No leak found. |
| 1614 | Add 1.2 mbar He exchange gas into IVC. |
| 1620 | Commence LN2 transfer. |
| 1800 | Nitrogen dewar has run dry. Cease nitrogen transfer and attach ping-pong ball. Probably enough nitrogen in main bath, so no need to refill dewar. Mixing chamber temperature 134 K and falling. |
| 2235 | Mixing chamber temperature 77.4 K. Start pumping He-4 exchange gas out of IVC. |