UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160205

2016/02/05 (Friday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50
Taking Y-Be photoneutron data overnight. Last flash at 07:26
0905 Remove Y source from source holder and put back into safe.
0910 Tower/MC(H35)/MC sensor/Cold Plate = 31.1/26.9/41/162 mK, Still = 1.32 K / 0.11 mbar, G1/G2 = 160/135 mbar, 1K Pot = 1.68 K / 10 mbar, Main bath = 70.1%
Tweak 1K Pot needle valve open a few more degrees
0915 Fill LN2 cold trap Dewar.
1207 Start 1 30min background series at -4/+4V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, 30s flash and 25 minute cooldown before series. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window.
1330 Remove Be discs from source holder. Waiting until cooldown is almost done before putting out strong 88-Y source.
1333 Start 1 30min Strong 88-Y series at -4/+4V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, 30s flash and 25 minute cooldown before series. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window.
1357 Place strong Y source in holder without Be (right at end of cooldown just before DAQ starts taking data)
1445 Remove Y source from fridge, return to safe.
1445 Put Cf source in shield. Planning to check raw event rate versus Cf position
Raw rate from Cf source
Position height above det (in) horiz. dis to det (in) counts Rate (Hz)
det level 0 10 58 290
10“ above det lev 10 10 38 190
6” down from shield top 20 10 22 110
shield top 25 10 25 135
top flange of bath 43 10 21 105
source removed inf inf 15 75

this implies that Rate[Hz] = 20000/(100+(Height[in])^2)+90 approximately
implies 61% pileup at detector level
can achieve 40% pileup at 14“ above det level = 11” down from top of shield

1545 Fill LN cold trap Dewar
1609 Place Cf source 11“ down from top of shield.
1610 Start 20 30min Cf series at -4/+4V with FG=5/2/5, OG=3, with 1000 initial randoms, 1000 ending randoms, 30s flash and 25 minute cooldown before series. Trigger on DIB1 phA with threshold of 20ADC bins and DIB1 qInner&qOuter each with threshold 210 ADC bins, with 150 us pileup cut window.

Next Day