2015/08/15 (Saturday)
| Overnight status: fridge running normally, DIBs plugged into HV box but DCRC power off. | |
| 1550 | Tower = 32.9 mK. Still = 0.11 mbar. G1/G2 = 220 mbar (before LN fill). 1K Pot = 1.75 K / 24 mbar. Main bath = 29.8%. |
| 1600 | Fill LN2 cold trap full. |
| 1610 | Commence LHe transfer (29.8%). |
| 1645 | End LHe transfer (84.6%). |