Setup: iZIP mode, DIB1/2/3 → 3.2 MHz filters → cables → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield at standard position
DCRCs powered overnight. Pumping on IVC with turbo pump overnight. Baked detector for 12 hours (ended at 5:34). Tower = 0.4 K during bake.
0840 Tower/MC/Coldplate = 40.6/32.7/157 mK, Still = 1.29 K / 60 μbar, G1/G2 = 220/205 mbar, 1K Pot = 1.56 K / 5.5 mbar, MB = 49.2%.
Boiloff rate: good.
0845 Fill LN2 cold trap bath
0855 All phonon channels look good, much better than yesterday, normal fall times, all channels show pulses. Adjust driver offsets so that all baselines are around -0.7
0858 Flash detector for 6 seconds using flashandflash script
0905 Turn off DIB2 FETs using wr 30 0 in telnet session. Tower rises to 180 mK then falls again.
0926 With DIB2 FETs turned off, Manually start one 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
0955 Begin filling HPGe dewar again.
0956 Stop data. After randoms finish, zero Qbias. Flash for 30s, and let cool.
0959 Flash finished. Begin 25min cooldown.
1022 With 23 minutes passed, turn off DIB2 FETs to allow for temperature spike. Tower temp spikes to 150mK, then falls again.
1030 Tower temp = 41.8mK and still dropping. Check phonon and DIB1 charge channels: all showing pulses. Wait for a few more minutes to let tower temp get below 40mK.
1037 Tower temp = 40.0mK. With DIB2 FETs turned off, Manually start one 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1108 Stop data. Tower temp = 38.6mK. After randoms finish, zero Qbias. Flash for 30s, and let cool.
1111 Flash finished. Begin 25min cooldown.
1120 Turn off DIB2 FETs to allow for temperature spike.
1136 Tower temp = 40.2mK. With DIB2 FETs turned off, Manually start one 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
Forgot to set Qbias, so for the first couple randoms, the Qbias was set to 0, but 30 seconds later, the Qbias was properly set to -6/+6V.
1208 Stop data. Tower temp = 38.7mK. After randoms finish, zero Qbias. Begin closing V6 to begin warmup procedure.
1210 Turbo pressure at 1nbar. Isolate turbopump from IVC during warmup.
1215 V6 closed. Close V13B and turn off He3 pump. Turn on MC heater to 1mW. Tower temp = 250mK and rising.
1235 Lower mu-metal shield 180cm below standard position
1240 Tower = 1.11 K and rising, G1 (condenser) = 35 mbar and falling. IVC = 7.4 nbar
1248 Tower 1.3 K → 3.0 K. IVC = 250 nbar. G1 (condenser) reached 30 mbar minimum, now 95 mbar and rising. Open turbo pump valve to pump out IVC.
1300 Tower = 3.3 K, G1 (condenser) = 125 mbar and rising. Turn off MC heater.
1K Pot rises to 1.68 K / 10 mbar, no longer oscillating, might be empty. Tweak needle valve open a little more.
1315 Tower = 2.6 K, G1 (condenser) peaked at 160 mbar, now 135 mbar and falling. 1KPot = 1.65 K / 19 mbar.
1330 Tower = 2.5 K, G1 (condenser) 100 mbar and falling more slowly.
Open V13b and turn on 3He pump. G1/G2 settle at 135/125 mbar.
1335 Open V6 to 13.3%, G1/G2 begin to rise. Begin opening V6 in steps.
1400 V6 = 13.7%, Tower = 1.5 K, G1/G2 = 300 mbar, Still pressure (P1) falls into readable range.
1430 V6 = 14.4%, Tower = 1.1 K, G1/G2 = 310 mbar, Still pressure (P1) = 3.4 mbar
1450 V6 = 15.0%, Tower = 0.80 K, G1/G2 = 330 mbar, Still pressure (P1) = 1.6 mbar. Open V6 100%.
1510 Tower = 95 mK, G1/G2 = 335/305 mbar and falling (peaked at 370/340 mbar), Still = 150 μbar
1535 Tower = 44 mK, G1/G2 = 250/230 mbar and falling, Still = 110 μbar
Tower has been cooled below Al transition with mu-metal shield 180cm below standard position
1540 Raise mu-metal shield back to its standard position.
1545 Commence LHe transfer (38.8%)
1620 Check phonon pulses, most railed, all restored by adjusting driver offsets and baselines set to near -0.7. All have good pulses and reasonable noise.
1650 Cease LHe transfer (92.2%)
1653 Fill LN2 cold trap.
1700 Commence 12 hour overnight bake using Flash&Flash script.
Release pressure from main bath.
1720 Release pressure from main bath.

Next Day