2016/06/01 (Wednesday)

Previous Day

Status: LN2 in MB, cooling overnight. Both cold traps at room temperature.
0800 MC = 77.4 K, Sorb = 131 K, IVC = 1.9 mbar. Sorb slowly warming, about 3 K in the last 10 hours.
0825 Pump out both LN2 cold traps. Each has around 0.5 mbar.
0835 Put LN2 cold traps into bath
0840 Begin blowing out LN2 from MB into cold trap bath. G3 (bath pressure) rises to 400 mbar relative, adjust He cylinder regulator valve so G3 falls below 350 mbar. Settles at about 300 mbar.
0915 Pump IVC down to 4.6e-2 mbar (He exchange gas)
0915 G3 (main bath) drops to 150 mbar, probably the LN2 removal is almost finished
0925 G3 (main bath) drops again to 115 mbar
0935 Pump out main bath. After about 7 minutes P2 falls below 1 mbar.
0950 Pressurize MB with He gas to 240 mbar relative on G3.
0955 MC = 79.7 K, Sorb = 142 K

Through-Put Test Modifications:

  • Before Step 6: put LN2 traps into bath and fill with LN2 (e.g. Trap 1)
  • Step 6: Open V9, V13a, V11a, V8, V3; this lets mixture out of the dump through the cold trap to settle in the lines, so wait for G1 and G2 to stabilize. (Optionally 3He pump can be on so that all mix is pushed out of pump.)
  • Step 7: At the first sign that G1 and G2 have stabilized, close V8 and V3; open V1 immediately after.
1000 Perform throughput test with the above modifications, so that mixture goes through cold trap before entering fridge.
Throughput = 45 mbar/minute. G1 reached minimum of 60 mbar with G2 at 615 mbar.
1010 Pump mixture from fridge to dump
1015 Pump Trap 1 contents to dump
1020 Evacuate 1K Pot. There was a lot of gas in it, above the P2 maximum.
1030 Was about to start LHe transfer but we need to wait for the 250L Dewar to fill. MC = 81.8 K, Sorb = 150 K
1300 LHe arrives. MC = 92 K, Sorb = 173 K
1305 Commence LHe transfer (-1.0%).
1309 Commence cryocleaning through cold trap 1.
1335 Sorb peaks at 178 K then starts to decrease
1350 MC peaks at 95.6 K then starts to decrease
1415 MC = 93 K, Sorb = 155 K, IVC = 4.0e-2 mbar
1500 MC = 66 K, Sorb = 59 K, IVC = 1.4e-2 mbar
1535 MC = 50K, Sorb = 7K, IVC = 8.6e-3 mbar. Cease cryocleaning, and pump mixture back to dump.
1545 MB level meter begins to register LHe in bath
1633 Stop pumping to dump with 794 mbar in the dump.
1635 Pump out lines leading up to Cold Trap 1 via P2 lines. Isolate pump, and open V7 and V11A to connect cold trap 1 to P2. Pull Cold Trap 1 out of LN2 bath to warm up.
1640 MC = 19K, Sorb = 5.5K. Open up turbopump to IVC to pump out exchange gas.
1723 End LHe transfer (92.1%).
1735 Release pressure from Main Bath. Since Cold Trap 1 is still sitting out to warm up and Cold Trap 2 had been pumped clean yesterday, I'm not going to fill the LN2 bath.