| 1000 | Perform throughput test with the above modifications, so that mixture goes through cold trap before entering fridge. |
| | Throughput = 45 mbar/minute. G1 reached minimum of 60 mbar with G2 at 615 mbar. |
| 1010 | Pump mixture from fridge to dump |
| 1015 | Pump Trap 1 contents to dump |
| 1020 | Evacuate 1K Pot. There was a lot of gas in it, above the P2 maximum. |
| 1030 | Was about to start LHe transfer but we need to wait for the 250L Dewar to fill. MC = 81.8 K, Sorb = 150 K |
| 1300 | LHe arrives. MC = 92 K, Sorb = 173 K |
| 1305 | Commence LHe transfer (-1.0%). |
| 1309 | Commence cryocleaning through cold trap 1. |
| 1335 | Sorb peaks at 178 K then starts to decrease |
| 1350 | MC peaks at 95.6 K then starts to decrease |
| 1415 | MC = 93 K, Sorb = 155 K, IVC = 4.0e-2 mbar |
| 1500 | MC = 66 K, Sorb = 59 K, IVC = 1.4e-2 mbar |
| 1535 | MC = 50K, Sorb = 7K, IVC = 8.6e-3 mbar. Cease cryocleaning, and pump mixture back to dump. |
| 1545 | MB level meter begins to register LHe in bath |
| 1633 | Stop pumping to dump with 794 mbar in the dump. |
| 1635 | Pump out lines leading up to Cold Trap 1 via P2 lines. Isolate pump, and open V7 and V11A to connect cold trap 1 to P2. Pull Cold Trap 1 out of LN2 bath to warm up. |
| 1640 | MC = 19K, Sorb = 5.5K. Open up turbopump to IVC to pump out exchange gas. |
| 1723 | End LHe transfer (92.1%). |
| 1735 | Release pressure from Main Bath. Since Cold Trap 1 is still sitting out to warm up and Cold Trap 2 had been pumped clean yesterday, I'm not going to fill the LN2 bath. |