UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160714

2016/07/14 (Thursday)

Previous Day

Status Began circulation yesterday. Cf source on fridge for overnight activation.
0840 Tower/MC/Coldplate = 319/106/168 mK, Still = 1.17 K / 0.095 mbar, G1/G2 = 55/65 mbar, 1K Pot = 1.47K / 2.4 mbar, MB = 42.2%
MC temperature decreasing continuously overnight, seems to be another slow cooldown.
G2 has been greater than G1 since circulation began, suggests maybe some impedance in LN2 Cold Trap 1
0845 Remove Cf source from fridge and return to safe
0850 Fill LN2 cold trap bath
Open 1K Pot needle valve a few degrees further
0855 1K Pot has gone up, and interestingly this caused the circulation pressures to increase significantly and improving the cooling power (tower is cooling faster)
0900 Tower/MC/Coldplate = 311/93/164 mK, Still = 1.26 K / 0.150 mbar, G1/G2 = 80/90 mbar, 1K Pot = 1.69 K / 26 mbar
0925 Apply 2 mW power to still. This causes a significant drop in MC temperature, 91→86 mK in 5 minutes
0955 Tower/MC/Coldplate = 296/84/157 mK, Still = 1.27 K / 0.160 mbar, G1/G2 = 75/90 mbar, 1K Pot = 1.64 K / 15 mbar
0956 HPGe crystal background run stopped.
1200 Filled HPGe dewar.
1240 Tower/MC/Coldplate = 248/74/141 mK, Still = 2 mW / 1.05 K / 0.140 mbar, G1/G2 = 65/80 mbar, 1K Pot = 1.55 K / 5 mbar
1245 Open 1K Pot needle valve a few degrees further
1255 Connect DCRCs 1/2/3 and power them on. Zap SQUIDs. (recall these are DCRC55/33/50, Revs C.1/C/C.1)
1315 Having difficulty triggering on the signal generator during SQUID tuning on DCRC1/DIB1. Waveform won't stay in place in pulse viewer.
1519 Commence LHe transfer (31.8%).
1545 Unpower DCRCs and restart MIDAS server. Repower DCRCs and zap SQUIDs.
1605 Cease LHe transfer (92.1%).
1700 Finish tuning SQUIDs with following values:
SQUID Bias (uA) Lockpoint (mV)
DIB1 pA* -50.0 -1.67
pB -64.9 -2.60
pC -60.3 -3.07
pD* -60.6 -1.50
DIB2 pA 84.8 4.68
pB 86.7 3.06
pC 79.2 2.57
pD 93.5 2.76
DIB3 pA -74.0 -3.78
pB -81.2 -3.72
pC -80.3 -2.47
pD -82.6 -4.53
*NOTE: Indicates a channel with a noticeably bad SQUID
1705 Fill LN2 cold trap full.
1718 Begin overnight HPGe run.
1730 Tower/MC/Coldplate = 161/53/141 mK, Still = 2 mW / 1.39 K / 0.140 mbar, G1/G2 = 80/90 mbar, 1K Pot = 1.49 K / 4.5 mbar
1735 Open 1K Pot needle valve a few degrees further

Next Day