| 1030 | Cf source still inside fridge shield for activation. Having some issue opening the safe, so leave the source inside shield for now. Fill LN2 cold trap full. |
| 1045 | Got the safe open; I think the latch needed to be jiggled to prevent the safe from thinking it was engaged. Place Cf source back inside safe. |
| 1145 | Pump and flush main bath in preparation for LN2 transfer. |
| 1155 | Evacuate 1K Pot. |
| 1230 | Add 6.3mbar of He exchange gas to IVC. |
| 1240 | Commence LN2 transfer. |
| 1355 | Prepare for cryocleaning mixture. Turn on He3 pump. Open manual dump valves. Open V9. It reads 779mbar. Using today's barometric pressure of 30.14inHg, the true pressure in the dump is ~786mbar. Still appears that there's less than the 800mbar of mixture we expect. Cryocleaning might pick some up in the lines in the IGH. Close V9, Open V4, V12A, and the Cold Trap 1 speedivalve to let mixture backflow into Cold Trap 1. |
| 1400 | Open V14, V13A, and V6 to 12.8% to begin cryocleaning through Cold Trap 1. |
| 1440 | Mixing Chamber temperature at 124K. Sorb temperature at 175K. |
| 1510 | Mixing Chamber temperature at 107K. Sorb temperature at 138K. |
| 1530 | Mixing Chamber temperature at 99K. Sorb temperature at 128K. |
| 1540 | Cease LN2 transfer. Attach ping pong ball to exhaust port. |
| | Cease cryocleaning. Pump mixture back to dump. |
| 1550 | G1: 0.5mbar, G2: 790.5mbar, P1: 14ubar. Close V12A and Cold Trap 1 speedivalve to isolate Cold Trap 1. Open V1 to pump out He Cold Trap. G2 increases slightly. |
| 1610 | G1: 0.5mbar, G2: 792mbar, P1: 7ubar. Close V5 and V6 and V9 to isolate mixture in dump. Turn off He3 pump. |
| 1715 | Mixing Chamber temperature at 81K, Sorb temperature at 123K. External pressure sensor reads 1.6mbar. Turn on scroll pump and commence pumping out IVC exchange gas with it. |
| 1716 | Fill LN2 cold trap full. External pressure sensor reads 3.0E-2mbar. Switch to turbopumping on IVC overnight. |