UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160809

2016/08/09 (Tuesday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield at standard position
DCRCs powered overnight, took bg data last night. Pumping on IVC with turbo pump overnight.
0850 Tower/MC/Coldplate = 39.9/47.8(?)/153 mK, Still = 1.30 K / 55 μbar, G1/G2 = 170/155 mbar, 1K Pot = 1.48 K / 2.8 mbar, MB = 36.9%.
Boiloff rate: good.
1K Pot has been somewhat oscillatory, 1.46-1.54 K, 2.5-4.0 mbar. Leave it for now, maybe this is an OK state.
0900 Fill LN2 cold trap bath.
0930 Only six series of data were taken last night, expected 9. Last one started at 21:47. It looks like there were flashes at about 21:30 and 22:21… so there was a flash after the final series at the correct time but no data taken after that. Sequencer shows an error “Cannot start run: Cannot start run: or timeout froun: or timeout fro_01' on host c fro_01' on host”. So something went wrong with the DAQ apparently. On Messages there were some errors, the first was “22:39:10.169 2016/08/08 [mhttpd,ERROR] [system.c:4584:recv_tcp2,ERROR] unexpected connection closure”, so maybe an interruption in the network?
1218 Isolating turbo pump from IVC (gauge reads 1.4nbar) Begin warm up procedure. Closing v6.
1230 Tower temp = 320mK. V6 closed all the way. Close V13B and turn off He3 pump. Turn on MC Heater to 1.0mW. IVC pressure = 7.4nbar.
1245 Tower suddenly jumps from 0.9 K to >3 K, another He boiloff it seems. IVC = 630 nbar.
1300 Turn off MC heater.
Lower mu-metal shield to 180 cm below standard position.
Begin pumping on IVC with turbopump. Turn on 3He pump, open V13b.
1310 Tower/MC/Coldplate/Still = 3.3(falling)/3.7/6.7(?)/4.6 K
1315 Tower temperature = 3.6 K and rising, G1/G2 = 330/300 mbar and rising, 1K Pot = 2.30 K / 3.4 mbar. I think the 1K pot is dry. Tweak 1K Pot needle valve open a little more. 1K pot temperature falls quickly. G1/G2 begin to fall.
1310 Tower/MC/Coldplate/Still = 2.7(falling)/2.9/4.5/2.5 K, G1/G2 = 220 mbar and falling, 1K Pot = 1.64 K / 16 mbar and falling
1355 Tower = 2.3 K, G1/G2 = 85/75 mbar and flattening, 1K Pot = 1.61 K / 9.5 mbar and oscillating
1400 Open V6 to 13.4%, G2 starts rising.
1430 V6 has been opened to 13.8%. Still pressure drops into readable range. Tower = 1.4 K. G1/G2 peaking around 300 mbar between V6 adjustments.
1438 Take HPGe test data measuring pre-amp output directly with DCRC
1455 Open V6 all the way. Tower temp = 1.05K and falling.
1505 Tower = 440 mK and falling. G1/G2 = 325/300 mK and falling slowly. Still = 140 μbar and falling slowly. 1K Pot = 1.53 K / 5.5 mbar
1510 Tower = 200 mK and falling
1515 Tower = 100 mK and falling. G1/G2 = 275/255 mK and falling. Still = 95 μbar. 1K Pot = 1.56 K / 5.5 mbar
1535 Tower = 63 mK and falling. G1/G2 = 215/200 mK and falling. Still = 65 μbar. 1K Pot = 1.54 K / 4.5 mbar
1600 Tower = 47.8 mK, G1/G2 = 195/180 mK, Still = 60 μbar
1601 Raise mu metal shield. Tower has been cooled below Al transition with mu-metal shield 180 cm below standard position
1604 Commence LHe transfer (25.7%)
1610 Reset timing link on DCRCs (after reconfiguring for HPGe data and switching back to iZIP mode)
1620 Tower = 43.1 mK
1630 Adjust phonon driver offsets to get all the baselines around -0.7-something. Some noise in some of them but maybe just from the transfer.
1635 Tower = 41.3 mK, G1/G2 = 200/185 mbar and flattish, Still = 70 μbar
1707 Cease LHe transfer (91.8%)
1715 Let pressure out of Main Bath.
1730 Fill LN2 cold trap full.
1740 Let pressure out of Main Bath.
1748 Start 8 hours of 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.

Next Day