| | Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50 |
| | Taking Y-Be photoneutron data overnight. DAQ crash last night after a few series. |
| 0830 | Removed strong Y source from Y-Be source holder. |
| 0835 | Tower/MC(H35)/MC sensor/Cold Plate = 31.4/27.3/39/150 mK, Still = 1.12 K / 0.12 mbar, G1/G2 = 180/175 mbar, 1K Pot = 1.72 K / 18 mbar, Main bath = 36.3% |
| 0840 | Fill LN2 cold trap Dewar. |
| 1230 | Place Cf source inside shield down near detector for activation. |
| 1600 | Main bath = 24.6% |
| 1605 | Start LHe transfer (24.2%) |
| 1705 | Place Cf source back in safe. |
| 1714 | Finish LHe transfer(89.2%) |
| 1740 | Place strong Y source in Y-Be source holder. |