UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20150310

2015/03/10

1500 Mixing chamber temperature 19.1 K, sorb temperature 19.7 K, background helium leak rate in lines leading to IVC 9.7E-10 mbar l/s. Open up IVC. Helium leak rate reaches 4.6E-8 mbar l/s. Increased by an order of magnitude from two days ago. Might be cause for concern, but we have operated with higher leak rates in the past.
Isolate IVC. Isolate leak checker and resume pumping on lines to IVC with turbo pump. Start 1 K pot.
1520 After dropping to ~1.8K, 1K pot temperature rises to 1.97K. Close needle valve to cool.
1655 Commence LHe (8.7%).
1750 End LHe transfer (91.1%).