UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20150428

2015/04/28

1100 Perform electrical check on striplines currently installed in fridge. Results in table below.
Stripline Bad Pins
19 QET B (FEB Pin 26). No shorts to ground.
20 Qo Bias (FEB Pin 21). No shorts to ground.
27 Feedback coil B, Feedback coil C, QET D Return. No shorts to ground.
1630 Create FEB-side board for stripline 19. Finish tomorrow when remaining materials arrive.
1730 Conduct electrical check on striplines shipped from Berkeley. Two fully functional striplines found, results posted on tomorrow's run diary page.