2015/04/28
| 1100 | Perform electrical check on striplines currently installed in fridge. Results in table below. |
|---|
| Stripline | Bad Pins |
|---|---|
| 19 | QET B (FEB Pin 26). No shorts to ground. |
| 20 | Qo Bias (FEB Pin 21). No shorts to ground. |
| 27 | Feedback coil B, Feedback coil C, QET D Return. No shorts to ground. |
| 1630 | Create FEB-side board for stripline 19. Finish tomorrow when remaining materials arrive. |
|---|---|
| 1730 | Conduct electrical check on striplines shipped from Berkeley. Two fully functional striplines found, results posted on tomorrow's run diary page. |