| 1425 | Commence warm up procedure. Close V13B, open V9 to begin pumping mixture to dump. Open V5 to pump from both sides of the fridge. Close 1K pot Needle Valve to stop helium from entering 1K Pot. Close 1K Pot speedivalve once the 1K Pot temperature has stabilized (empty pot). |
| 1430 | Close V4A to isolate 1K Pot Pump (He4 Rotary Pump). Close He4 pump He Recovery valve and switch Yellow valve on He4 Pump exhaust from Recovery to Exhaust. Close manual valve on He4 pump inlet. Turn off He4 pump. Turn on Mixing Chamber heater gradually to 20mW. |
| 1440 | Pressure in P1 rose to ~9mbar, then began decreasing as more mixture collected in the dump. Currently P1: .22mbar, G1: ~2mbar, G2: 356mbar and climbing gradually. |
| 1521 | MC Temperature 2.126K, Cold Plate: 460mK , Still: 1.594K, P1: 0.20mbar, G2: 609mbar (still rising). Barometric pressure today: 29.61 inHg. |
| 1633 | Tower Temperature: 10.8K, MC Temp: 10.8K, P1: 16ubar, G2: 808mbar. Stop pumping to dump and isolate fridge lines by closing Condenser Line Speedivalve and Gate Valve. Turn off Mixing Chamber Heater. Close V1 and V6. Still pumping on Cold Trap 2 through V5. |
| 1637 | Fill LN2 cold trap full. |
| 1647 | Still: 12.3K. Close V12B and V5 to stop pumping from Cold Trap 2. G2 shows 806.4mbar of mixture in Dump. Close V9 and turn off He3 pump. |
| 1649 | Tower temperature at 10.6K. |