| 1405 | Fill LN2 cold trap full. |
| 1410 | Plug in all three DCRC boards, noticing a oscillation in Q-outer on all boards, strongest on DCRC55. |
| | Notice that temperature has spiked to 42 mK and begun to settle. The scroll pump was also making loud noises, so the temperature spike could be related to filling the trap, the pump, the boards, or something else? |
| 1415 | Zap all SQUIDs. |
| 1425 | Commence LHe transfer (14.5%). Temperature plummeted back to base (31 mK) after transfer was started.Oscillations in Q-outer also gone. |
| 1435 | Flash on all three dibs to bake overnight. |
| 1505 | End LHe transfer (91.9%). |