Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield at standard position
0805 Tower/MC/Coldplate = 57.1/30.7/161 mK, Still = 1.39 / 0.075 mbar, G1/G2 = 210/195 mbar, 1K Pot = 1.55 K / 5.5 mbar, MB = 68.9%
Boiloff rate is good so yesterday's pressure releases worked: one 10 min after fill, one 30 min after fill
Tower temperature has been rising slowly overnight, no other obvious cryo problems. Looks like MC and CP are elevated too, maybe also Still (but it's pressure is normal, and the thermometer sometimes just read high)
0810 Tweak 1K Pot needle valve open a few more degrees
0815 Fill LN2 cold trap bath
IVC pressure is I think a little higher than it has been, at 10 nbar. Maybe He buildup in the IVC is one reason the temperature is going up.
0820 Start pumping IVC with turbo pump
0853 Small spike in Tower temperature then falls to somewhat lower, 53-54 mK. Don't know why. Later: it hit a minimum at 9:40 but then started creeping up again toward this morning's base
1030 Turbo = 1.6 nbar while pumping IVC. Close valve @ turbo pump: after a few minutes IVC = 8.6 nbar. Not surprising it didn't go down much with tower at base.
1215 Tower is up to 55.1 mK
1315 Tower is up to 56.6 mK. IVC is back up to 10 nbar.
1700 Top off LN2 cold trap before switching circulation from Cold Trap 1 to Cold Trap 2.
1705 Tower temperature: 59.9 mK. P1: 75ubar, G1/G2: 202/188 mbar. 1K Pot: 1.58K / 7.0mbar.
1710 Open V13B to let mixture into Cold Trap 2. Close V13A and open V12B and Cold Trap 2 speedivalve to begin circulating through cold trap 2. Close V12A and Cold Trap 1 speedivalve. Mixture is still present in Cold Trap 1. Open V11A and V8 to let it back into circulation.
1713 While letting the remaining mixture from Cold Trap 1 back into circulation, Tower temperature rises to 77mK then begins oscillating. G1/G2 have reached 204/188 mbar and stabilized. P1 rose to 340mbar before falling rapidly. Currently P1 is at 0.70mbar.
1725 Tower temperature back down to 60.2mK. P1: 0.12mbar and still dropping. G1/G2: 207/184mbar. 1K Pot: 1.58K / 7.0mbar. I suspect cleaning the He cold trap will be in order, but will have to wait until the LN2 Cold Trap 1 has had all the mixture pumped out of it.
1755 Tower temperature at 61mK and continuing to increase slowly. P1 has been at 0.10mbar for about 10 minutes now. Will leave V8/V11A open a bit longer to ensure we get all the mix out of cold trap 1.
1815 Close V11A and V8. P1=0.1mbar.
1820 MB = 54.7%