UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20151016

2015/10/16 (Friday)

Previous Day

Current setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50.
Overnight: No data, Cf source near detector for activation. Tower temp stable.
0925 Tower/MC(H35)/MC sensor/Cold Plate = 30.8/25.1/41.4/157 mK, Still = 1.37 K / 0.11 mbar, G1/G2 = 155/130 mbar, 1K Pot = 1.73 K / 22 mbar, Main bath = 39.5%
0930 Fill LN2 cold trap full.
1000 Replace “suspect” gender swapper with new one. Power on DCRC55 on DIB1. All channels look fine.
1035 Put Cf source back in safe.
1050 Flash all three DIBs for 30s in preparation for taking long de-neutralization runs.
1118 Start 45min background data series at -/+4V, FG=5/2/5, OG=3, with 1000 initial randoms, 2000 events/file, 30s flash and 25min cooldown after. Phonon thresholds the same as Monday's values.
1120 Notice that DIB1 pB is showing signs of having a test signal down it. The pulses have a longer rise leading up to them. Stop data run. Check 40ms trace length, and measure the noise. It shows 83Hz “test signal” noise.
1125 Check register 3c on DCRC55, but it reads back 0000, meaning all QET return line test signals are disconnected. Looking back at an email from Bruno, on the RevC.1 boards, register 3d also controls test signals. Read 3d on DCRC55, returns 0DD7. According to Bruno's email, this means the test signal is active. Write 3d 09D7 instead to turn off test signal, and DIB1 pB no longer shows signs of 83Hz noise!
1128 Start data again, but notice that a few channels are railed. So stop data run to unrail channels.
1134 Start 45min background data series (again) at -/+4V, FG=5/2/5, OG=3, with 1000 initial randoms, 2000 events/file, 30s flash and 25min cooldown after. Phonon thresholds the same as Monday's
1324 Start 15min background data series. Two cycles at -/+4V, FG=5/2/5, OG=3, with 1000 initial randoms, 2000 events/file, 30s flash and 25min cooldown after. Phonon thresholds the same as Monday's values.
1451 Commence LHe transfer (30.7%)
1618 Cease LHe transfer (93.5%).
At end of transfer, LHe transfer tube breaks, so deal with that…
1704 Start background data series 22 cycles at -/+2V, FG=5/2/5, OG=3, with 1000 initial randoms, 2000 events/file, 30s flash and 25min cooldown after. Phonon thresholds the same as Monday's values.
1710 Well now we pushed the transfer back to Sunday, so stop data series to modify DAQDAQ to take more series.
1712 Start background data series 53 cycles at -/+2V, FG=5/2/5, OG=3, with 1000 initial randoms, 2000 events/file, 30s flash and 25min cooldown after. Phonon thresholds the same as Monday's values.
1714 Fill LN2 cold trap full.

Next Day