2016/04/11 (Monday)

Previous Day

SQUETs and striplines for iT4 (six each) are being sent to us from Soudan. Should arrive by end of week. Friday installation I suppose.
1515 Check some of the connections for the DIB1 stripline (#19) to breakout box with the modified diverter boards installed. The broken SQUID B return is now showing continuity.
1539 Am-241 copper housing was taken to the CSE machine shop for fitting of HV electrode screw holes.
Soudan Tower IT4
have tentatively identified this tower body as ZB1-7. Our old one is ZB1-5.
1615 Remove all side coaxes from tower
Debris log: one <1mm white thing, piece of wipe or dental floss; tiny black bits (circuit board material?); one tiny copper flake
One loose piece of solder on Face 3 near solder connections at MC stage heat sink:
In original location Knocked a little out of place
This is between Pins 9 and 10 on Face 3. That's LED1 and LED2 on iT4Z3 DIB1.
No relevant problem was reported at Soudan.