| Setup | DIB1/2 → cables → Dsub filters → DCRC55/50. Taking Ba data overnight. |
| | Tower temperature fluctuating by about 1 mK since last flash at 10:30 |
| 1525 | Filled LN2 cold trap bath. |
| 1530 | MC/Tower: 31.5/45 mK. Still: 95 μbar. G1/G2: 105/100mbar. 1K Pot: 1.56K / 5.5 mbar. Main bath = 32.4% |
| 1535 | Begin LHe transfer @ 31.8% |
| 1610 | He cylinder runs out, swap with spare |
| 1708 | Finish LHe transfer @ 87.5% |
| 1715 | Let pressure out of MB |
| 1715 | Start script SUNDAY_flashandsweep.msl from Sequencer from online MIDAS daq, to continue Ba voltage sweep. A flash happens so it seems to be working. |