| 1320 | Arrive to find P1=16 ubar, G1=.8 mbar, and G2=669.1 mbar. |
| 1420 | Commence cryocleaning through coldtrap 1. Start pumping of IVC. Start LHe transfer (0.8%). |
| 1500 | End LHe transfer (48.8%) |
| 1530 | Start pumping mixture to dump. |
| 1545 | G1=0.3 mbar, G2=639 mbar, P1=15 ubar. |
| 1555 | Commence cryocleaning again. |
| 1705 | Start pumping mixture to dump. |
| 1720 | G1=0.1 mbar, G2= 624.6 mbar, P1=15 ubar. These values suggest that no mixture was lost. Prepare to clean cold trap 1. |
| 1730 | Pull out cold trap 1. |
| 1805 | Finish one round of cold trap 1 cleaning. Isolate IVC. |
| 1817 | Start 1 K Pot. Fill LN2 cold trap full. Open gate valve and condenser line speedivalve, during which P1 rises to .5 mbar. |
| | Start condensing procedure with 624 mbar mixture in the dump. Since we want 350 mbar in the lines, we will close V9 when G2=274 mbar. |
| 1842 | Close V9 with 274 mbar inside the dump. |
| 1850 | Open V12 all the way. |
| 1858 | Although G1 and G2 have reached ~80 mbar and started increasing, attempt circulation anyway. Mixing chamber temperature at 2.25 K. |
| 1915 | Open V6 all the way. Currently mixing chamber temperature at 1.007 K and dropping, G1=123 mbar, G2=135 mbar, P1=.26 mbar, and 1K Pot temperature at 1.591 K. |
| 1920 | Mixing chamber temperature at 750 mK and dropping. |
| 1922 | Mixing chamber temperature at 631 mK and has started rising. The village folk are readying their pitchforks. |
| 1935 | Mixing chamber temperature has somewhat stabilized, oscillating around 880 mbar. 1K Pot temperature at 1.578 K, G1=127.7 mbar, G2=134.8 mbar. Leave the system overnight. |
| ???? | Feed Wicket Alexander. |