2015/11/23 (Monday)

Previous Day

0810 Status: Tower assembled and ready to install.
0830 Remove tower from purge and place in mini cleanroom
Orienting the tower with DIB1 facing East (toward door), repeating orientation from last run:
Direction DIB SQUET Stripline Rerouting boards
East DIB1 ZC-23 19 present
West DIB2 ZC-70 27 present
SW DIB3 ZC-13 20 absent
1200 finish attaching adapter to 50 mK can. Clean flange on bottom of IVC middle piece.
1300 connect tower thermometer plug. Reads correctly at bridge.
1430 finish installing 100mK stage
1750 Attach striplines and SQUETS to 4K stage. Perform an electrical check to ensure no shorts or unexpected values. Electrical checks on all dibs OK. Complete 4K stage installation and torquing. Come tomorrow morning we only need to seal the bottom IVC flange and commence pumping out.