Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3)
DCRCs on overnight taking bg data. Note: fridge was cooled below Al transition with mu-metal shield at standard height. Tower temperature quite stable between flashes.
0735 Tower/MC/Coldplate = 34.7/31.5/157 mK, Still = 1.39 K / 0.15 mbar, G1/G2 = 165/155 mbar, 1K Pot = 1.44 K / 2.0 mbar, MB = 39.4%
0740 Close V6 to begin another warmup. Close V13a and turn off 3He pump.
0745 Fill LN2 cold trap bath
Open 1K Pot needle valve a few degrees more
Apply 1 mW to MC heater
0750 Lower mu-metal shield 45.9 cm below standard position (partially into pit)
0755 Still pressure (P1) reads “1000” mbar. Open V3. G1(condenser) falls from 35 to 20 mbar.
0800 Tower/MC/Coldplate = 0.83/0.96/0.84 K. 1K Pot = 1.62 K / 11 mbar
0820 Tower = 1.44, then starts to shoot up, to 2.9 K; G1 rising too
Tower/MC/Coldplate/Still = 3.1/2.3/2.4/2.8 K ,G1 = 50 mbar and climbing
0825 Tower = 3.3 K, G1 = 130 mbar and still climbing. Turn off MC heater. G1 settles at 150 mbar. Turn on 3He pump, open V13a, close V3.
0830 G1/G2 = 145/130 mbar. Begin opening V6. At V6 = 12.8% some increase in pressure is seen.
0835 G1/G2 = 150/135 mbar and flat, 1K Pot = 1.68 K / 11 mbar. Open V6 to 13.4% to see another pressure increase (maybe the increase seen at 12.8% was spurious)
0845 1KPot empties, 1.72K/20mbar → 2.5K/4 mbar. Tweak open needle valve, falls back to 1.8 K
0850 G1/G2 = 445/410 mbar and falling, 1K Pot = 1.80 K / 60 mbar. Open V6 to 13.6%. G1/G2 → 800 mbar, that's pretty high, and pot seems to be straining (2.1 K)
0855 Tower/MC/Coldplate/Still = 3.4/3.8/3.6/3.4 K
Stop circulation. Close V6, then V13a.
0900 1K Pot = 2.4 K and climbing, 20 mbar. Tweak it open, temperature falls to 1.8 K again
Yesterday when we couldn't get the still started we let the pot cool it to 2.2 K. Let's try to make that happen again.
0905 Condenser (G1) has fallen to 260 mbar. Open V3 to equalize still and condenser.
0915 Still = 3.2 K, G1 = 215 mbar and flat, 1K Pot = 1.73 K / 20 mbar. Doesn't seem to be cooling the still much.
IVC = 160 nbar. Is the temperature spike occurring from a boiloff of He in the IVC? Pump on IVC again with turbo.
0920 Still, G1, and 1K Pot have all started falling. Yep, gas in the IVC was screwing up the cooldown.
0925 Still = 2.5 K, G1 = 125 mbar, 1K Pot = 1.59 K / 7 mbar. All are falling. Turbo (pumping IVC) = 1.9 nbar
0935 Still = 2.1 K, G1 = 70 mbar, 1K Pot = 1.50 K / 4 mbar, leveling off. Turbo (pumping IVC) = 1.2 nbar
0940 Open V13a in spurts to let mix from dump into fridge, 1K Pot temperature spikes in response. Accidentally opened V13b at one point, so some mix was let into Trap 2. Will need to pump this back in at some point.
0945 Still = 1.9 K, G1 = 60 mbar, 1K Pot = 1.48 K / 3.4 mbar. Tweak needle valve. Close V3. Close pump to turbo, stop pumping out IVC. IVC = 7.4 nbar.
0950 G1/G2 = 60/50 mbar. Open V6 to 13.2%, G1/G2 start to rise.
0955 G1/G2 = 80/70 mbar. Open V6 to 13.5%.
–delay for meeting–
1100 G1/G2 = 114/105 mbar and falling slowly. P1 has actually fallen into readable range after the long delay. 1KPot = 1.43 K / 1.7 mbar, tweak it open more. Open V6 to 13.8%.
1120 G1/G2=214/198 mbar and stable. P1=6.5 mbar, and 1K Pot = 1.54 K/ 5.0 mbar. Open V6 to 14.0%.
1130 G1/G2=228/209 mbar and dropping. P1=2.4 mbar, and 1K Pot = 1.51 K/ 4.0 mbar. Open V6 to 14.6%.
1133 G1/G2=240/222 mbar and dropping again. P1=1.2 mbar and 1K Pot = 1.49 K / 3.8 mbar. Open V6 (cautiously) all the way. G1/G2 rise to 260/242 mbar and stabilize as P1 drops to 0.18 mbar.
1145 MC/Tower=416/440 mK and steadily dropping.
1150 Attempted crude repairs of damaged LN2 cold trap. Tried forcing dewar inner faces back into place using wood blocks, hammers, and crow bar.

1205 Tower = 73.2 mK, Still = 0.08 mbar, G1/G2 = 185/170 mbar and falling, 1K Pot = 1.45 K / 2.4 mbar
1225 Tower = 52.2 mK, Still = 0.08 mbar, G1/G2 = 170/160 mbar, 1K Pot = 1.44 K / 2.2 mbar. Tweak needle valve open a few more degrees. This made G1/G2 go up.
1240 Tower = 45.2 mK, Still = 0.09 mbar, G1/G2 = 205/190 mbar, 1K Pot = 1.65 K / 17 mbar.
1250 Tower hanging at 40 mK, probably because we don't have all the mix in there - there's some in the dump and some in Trap 2.
Open V14 briefly to let some mix from dump in, G1/G2 go up to 270 mbar then fall again
1255 Open V6 until G2 reaches 500 mbar then close again. Tower rises to 0.3 K then falls again.
1305 Tower temperature starting to stabilize at 98 mK, G1/G2 = 283/262 mbar. Open V14.
1307 After leaving V14 open, P1 has dipped below 1000 mbar and is rapidly decreasing while G1/G2 = 387/363 mbar. These pressures will not get above 500 mbar, so we can leave V14 open until all the mixture is out of the dump (P1 < 1 mbar). Currently tower temperature is at 149 mK and beginning to drop.
1330 G1/G2= 201/186 mbar, P1=0.80 mbar, Tower = 48 mK. Close V14 to isolate dump. Reminder: there is still some mixture that must be pumped out of cold trap 2 from earlier.
1400 Tower = 35.6 mK, Still = 0.085 mbar, G1/G2 = 170/160 mbar, 1K Pot = 1.45 K / 2.2 mbar.
1410 Get mixture out of Trap 2: Close V1 and V12a+speedi (stops return to condenser temporarily), open V12b+speedi and V3 (pumps Trap 2 to dump, and also increases still pressure, similar to opening V14 to get mix out of dump). Tower spikes to 3K(!) then fall quickly below 0.5 K. G2 building up but not too badly, to 320 mbar. P1 falls to 0.4 mbar after a few minutes.
1415 Close V12b+speedi and V3. Open V1. Open V12a speedivalve only, let pressure slowly out of trap into condenser. G1/G2 stabilize at 255/315 mbar. Open V12a 100%.
1435 Tower = 52.4 mK and falling, Still = 0.120 mbar, G1/G2 = 225/210 mbar, 1K Pot = 1.60 K / 8.5 mbar.
Tower has been cooled below Al transition with mu-metal shield 45.9 cm below standard position
1445 Raise mu-metal shield to standard position
1450 Commence LHe transfer (28.9%).
1515 Tower = 44.9 mK, Still = 0.095 mbar, G1/G2 = 175/165 mbar, 1K Pot = 1.44 K / 2.8 mbar.
1535 Check phonons, readjust driver offsets. All look OK.
1544 Cease LHe transfer. (91.8%)
1550 Release pressure from main bath (5 min after fill).
1555 Tower/MC = 43.2/30.6 mK, Still = 0.090 mbar, G1/G2 = 170/160 mbar, 1K Pot = 1.42 K / 2.2 mbar.
why is Tower elevated now, compared to before we let the Trap 2 mix back in? The Tower-MC difference is a lot higher, MC is as low as it was this morning.
1620 Tower/MC/Coldplate = 42.7/30.2/168 mK, Still = 1.45 K / 0.090 mbar, G1/G2 = 165/160 mbar, 1K Pot = 1.44 K / 2.6 mbar. Open needle valve a few degrees more.
1625 Release pressure from main bath (40 min after fill).
1635 MC = 41.8 mK, seems to be cooling slowly.
1635 Start 15 hours of 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1639 Tower temp went a little higher during the flash, to 260mK.
1640 Filled LN2 cold trap and top off HPGe dewar.
1711 1K Pot at 1.46 K / 3.4 mbar. Open needle valve a bit and give time to settle.
1722 After a few minutes 1K Pot has reached to 1.74 K / 85 mbar and the P2 pressure is still dropping slowly. Hopefully this will last through till tomorrow.