| 0955 | Fill LN2 cold trap full. |
| 1000 | Tower/MC(H35)/MC sensor/Cold Plate = 31.1/26.8/41.2/157 mK, Still = 1.37 K / 0.085 mbar, G1/G2 = 145 mbar, 1K Pot = 1.74 K / 22 mbar, Main bath = 31.8%. |
| 1010 | Power cycle DCRC55 to get rid of 80Hz pattern |
| 1040 | When applying yesterday's settings, DIB1 phonon channels railed. Relock brings back pC, but the others require setting the Frontend Gains to 1 in order to bring them back. After this, FG could be set back to 16/5 without the channels railing. |
| | Create new MultiDAQ files to do Frontend Gain sweeps of 16/5/16, 10/3/10, 5/2/5, 1/1/1 (in that order on DIBs 1/2/3). |
| 1155 | Take front-end gain sweep noise data: Start DAQDAQ2 to take 1000 initial randoms at the 4 different Frontend Gain values (Output Gain=3). In order to do this, Run Time had to be set to 2 minutes to properly take all the randoms. Because of this, there was ~30s of triggered data after each Random series. |
| 1420 | Begin LHe transfer at main bath = 25.7% |
| 1505 | Cease LHe transfer (94.8%). |
| 1625 | After some MIDAS tests, DCRCs were stuck in some kind of constant-zapping mode (Registers 45&4f on DCRC33 displayed 8181 when read instead of 3131 like the RevC.1 boards). This state led to a tower temperature of ~70mK, but the Still seemed to be more dramatically heated: P1 rose to 0.28mbar, G1/G2: 300/280mbar. |
| 1650 | Writing 3131 to registers 45&4f on DCRC33 decreased the temperature gradually to ~60mK, but then the temperature plateaued. Power cycle boards and allow fridge to cool. |
| | Again, when applying saved settings, phonon channels rail, but changing Frontend Gain to 1 brings the channels back, and they can then be reset to 16 or 5. |
| 1720 | Seeing the 80Hz pattern on DIB1 pB from earlier. Power cycle DCRC55. |
| 1745 | Prep DAQDAQ2 for overnight Cf run. |