| 0830 | Changed orientation of screw attaching tower thermometer to plate in source holder so screw points inward, then added housing lid to top of tower. Left tower on bench in clean room. |
| 1000 | Install lower 100 mK can, using brass screws (M3-8, philips-head) to 5 lb*in torque. |
| 1500 | Brass M3x12 philips-head screws arrive. |
| 1515 | Replace steel screws attaching adapter plate to tower with brass M3x12, to 5 lb*in torque |
| 1530 | Checked tower thermometer and found only two wires seemed connected. Resoldered the tower thermometer plug. First, checked the connection from the fridge plug to bridge with a resistor. The correct wiring is for one resistor lead to connect to the two outer pins and the other to connect to the two inner pins. After soldering, covered wire-pin connections with silicone sealant. After this sets, we need to tape over the end with kapton tape. |
| 1700 | Attached 30 mK can with brass M3x12 philips-head screws to 5 lb*in torque |
| 1715 | Attached middle IVC section |
| 1700 | Left tower double-bagged on clean room bench |