2016/07/20 (Wednesday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3)
DCRCs on overnight. Note: fridge was cooled below Al transition with mu-metal shield lowered 27.7 cm. Cf source on fridge for overnight activation.
0645 Tower/MC/Coldplate = 35.0/30.9/153 mK, Still = 1.30 K / 0.095 mbar, G1/G2 = 175/165 mbar, 1K Pot = 1.46 K / 2.4 mbar. MB = 39.8%
Tower temperature very stable overnight. MC(H35) may be lower, resistance continued to increase during measurement, got tired of waiting.
Boiloff note: rate still looks good, suggests no taconis
0655 Fill LN2 cold trap bath.
0655 Close V6 to begin warming above Al transition.
0700 Close V13a, turn off 3He pump, set MC heater to 1 mW
0705 Tower = 0.41 K and rising, G1(condenser) 75 mbar and falling, P1 (still) 50 mbar and rising, G2(pump outlet) 109 mbar and flat.
0705 Remove Cf source from fridge and return to safe.
0710 Lower mu-metal shield to 32.3 cm below standard position
0715 Tower = 0.67 K and rising, G1(condenser) 34 mbar and falling, P1 (still) 110 mbar and rising. Open V3. G1 falls to 17 mbar, P1 rises to 400 mbar.
0740 Tower reaches 1.4 K then suddenly jumps up to 3.2 K. (MC(Cernox) = 2.76 K.) G1 jumps from 20 mbar to 180 mbar and there's a surge in the 1K Pot.
0750 Turn off MC heater. Turn on 3He pump, open V13a, close V3.
0755 G1/G2 = 165/150 mbar. Start opening V6 to begin circulation. At 13.4% a response is seen, G1/G2 go up.
0820 At 8:10 1K Pot temperature shoots up to 3K, I think it ran dry. G1/G2 increase to near 700 mbar. Tweak open needle valve, 1K Pot and G1/G2 come back down.
0825 V6 = 13.6%, G1/G2 = 595/550 mbar and falling, 1K Pot = 1.71 K / 38 mbar. Tower = 1.85 K
0835 V6 = 13.8%. Tower/MC(H35)/Coldplate = 1.52/1.69/2.13 K, G1/G2 = 410/380 mbar and falling. P1(still) = 110 mbar.
0850 V6 = 14.5%. Tower/MC(H35)/Coldplate = 1.14/1.21/1.12 K, G1/G2 = 400/370 mbar and falling. P1(still) = 2.4 mbar.
0900 Open V6 100%
0905 Tower/MC(H35)/Coldplate = 0.37/0.29/0.32 K, G1/G2 = 325/300 mbar and flat. P1(still) = 0.17 mbar.
0915 Tower/MC(H35)/Coldplate = 87/69/177 mK, G1/G2 = 285/260 mbar and falling. P1(still) = 0.12 mbar.
0950 Tower/MC(H35)/Coldplate = 39.6/30.2/157 mK, G1/G2 = 195/180 mbar and flat. P1(still) = 0.075 mbar.
0955 Raise mu-metal shield to standard position
1020 Tower/MC/Coldplate = 36.0/28.6/154 mK, Still = 1.34 K / 0.070 mbar, G1/G2 = 185/175 mbar, 1K Pot = 1.54 K / 5.0 mbar. MB = 34.5%
1035 Adjust Driver Offsets to bring all pulses into range. Start a 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1140 Check all the phonon channels, pulses look good. Looks like the timing link wasn't active for the last run. Manually start timing link. Take a test series.
Note: DCRCs were disabled and reenabled with MIDAS for the HPGe run. Maybe this knocks out the timing link.
1145 Looking at raw pulses from this test it looks like the timing link is working again.
1145 Start a 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1245 Power outage. Both pumps fail, circulation ceases, 1K Pot ceases cooling. Cannot restart the pumps, presumably building 3-phase power has stopped. Looks like it began around 1203.
Still pressure went up at 12:03, so this must be when pumps stopped. Tower temperature began to increase at 12:04.
1250 Tower temperature has risen to 755mK and is rising. 1K Pot is at 4.0K/1000mbar. P1 has risen to 1000mbar, but G1/G2 are stable around 35mbar. Open V3 to equalize pressures between both sides of fridge. Close V13A to stop any circulation that might be happening. We'll just be mimicking the temporary warmup (though w/o the 1K Pot).
1303 Commence LHe transfer (29.6%).
1315 Tried just pushing the Mains On and Reset buttons, then starting the pumps. Pumps went on, power is back. Turn on 1K Pot.
1325 1K Pot pressure is reading 1000 mbar (lowish still on the mechanical gauge at least). Close the needle valve a bit. Falls to 1.74 K / 80 mbar, stabilizing.
1330 Restart circulation (V3 closed, V13a&V12a&V1 open, 3He pump on, start opening V6). AT V6 = 13.4% circulation pressures increase. (G1/G2 were down to about 40 mbar so probably there is a lot of mix in the dump. Or, maybe not? Not sure whether anyone released mix to the dump when the power outage was discovered. Actually Allison says they did, and at 12:48 there were small changes in pressures, G1=31→30 mbar, G2=34→37 mbar.)
1339 End LHe transfer at 92.8%
Tower temperature peaked at 0.83 K at 13:15. Hopefully this is accurate so that the Al didn't go normal, because we want the flux locked in from when the shield was lowered (because we need to retake that data). For good measure, lower the shield to 32.3 cm now before cooling further. (Already the tower is down to 0.72 K after getting the 1K Pot started.
1345 V6 = 13.4%, Tower = 0.72 K, G1/G2 = 90/85 mbar and falling, 1K Pot = 1.62 K / 15 mbar.
1347 Open port to allow pressure out of the main bath (8 minutes since the transfer ended).
1355 V6 = 13.6%, Tower = 0.64 K, G1/G2 = 150/135 mbar and flat, P1 = 34 mbar
1400 V6 = 13.8%, Tower = 0.61 K, G1/G2 = 165/155 mbar and flat, P1 = 6.0 mbar
1410 Open port to allow pressure out of the main bath (30 minutes since the transfer ended).
1410 V6 = 14.0%, Tower = 0.59 K, G1/G2 = 185/175 mbar and flattish, P1 = 4.5 mbar
1420 V6 = 14.2%, Tower = 0.59 K, G1/G2 = 220/205 mbar and flattish, P1 = 4.0 mbar
1430 V6 = 15.0%, Tower = 0.53 K, G1/G2 = 260/245 mbar and flattish, P1 = 1.3 mbar
1439 Open port to allow pressure out of the main bath (60 minutes since the transfer ended).
1440 V6 = 17.6%, Tower = 0.18 K, G1/G2 = 260/245 mbar and falling, P1 = 0.32 mbar, 1K Pot = 1.52 K / 5 mbar. Open V6 100%.
1500 Tower/MC/Coldplate = 40.0/33.2/154 mK, Still = 1.30 K / 0.110 mbar, G1/G2 = 100/185 mbar, 1K Pot = 1.50 K / 4.5 mbar.
1510 At base now. Mu-metal shield back in standard position. Start a 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1610 Sequence finished. All pulses still look good. Start a 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1615 Fill LN2 cold trap full.
P2: 1.8mbar. Open 1K Pot needle valve 16th of a turn.
1650 P2 has settled at 6mbar. Open 1K Pot needle valve another 16th of a turn.
1708 Sequence finished. All pulses still look good. Start 13 hours of 30min Ba series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1730 Placed Ba source on fridge at top of mu metal shield.

Next Day