| | No relation between electronics and mixing chamber temperature found. |
| 1040 | Fill LN2 cold trap full. |
| 1205 | Pump mixture to dump. G1: 155.3mbar, G2: 154.5mbar, 1K Pot Temperature: 1.752K. |
| 1230 | Commence LHe transfer (6.0%). |
| 1320 | Complete LHe transfer (93.0%). |
| 1423 | Close V1. |
| 1433 | G1: .9mbar, G2: 598.7mbar, P1: .04mbar. Open valve to pump potentially leftover mixture from cold trap 2 into dump. G1 increase to 2.9mbar. |
| 1445 | Close 1K Pot speedivalve. Turn on still and mixing chamber heaters to speed mixture recovery. |
| 1515 | Begin pumping on IVC with turbopump. Pressure reads 4.6E-3mbar, but is most likely lower. |
| 1605 | G1: .7mbar, G2: 709.5mbar, P1: .045mbar. Close gate valve and condenser speedivalve to protect whatever mixture may still be in fridge lines. |
| | P1 drops to .015mbar. Close V6 and turn off heaters. |
| | Switch to high-temperature thermometer. Fridge temperature jumps from ~1.7K to >4.2K. V6 completely closed; no increase in P1, so no indication of leak in fridge lines. |
| 1610 | G1: .8mbar, G2: 710.2mbar. Mixture “fully” in dump. Close all valves on IGH. Pull out nitrogen cold trap 1 and helium cold trap for cleaning. |
| 1620 | Commence first round of cold trap cleaning. |
| 1700 | Finish first round. |
| 1800 | Finish second round. |
| 1835 | Finish final round. |
| 1900 | Replace cold traps. |
| 1915 | Fill LN2 cold trap full. Despite pumping out of cold traps, G1 is still suspiciously high at 1.5mbar. G2: 711.1mbar (no significant increase since isolation of dump), P1: .017mbar. Mixing chamber temperature of 6.95K. |
| 1920 | Isolate He4 rotary pump. |
| 1930 | No change in G1 after isolation. Commence cryocleaning mixture through cold trap 1. |