Setup: iZIP mode, DIB1/2/3 → 3.2 MHz filters → cables → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield 180cm below standard position
DCRCs powered overnight. Pumping on IVC with turbo pump overnight. Baked detector for 12 hours (ended at 4:58). Tower = 0.4 K during bake.
0840 Tower/MC/Coldplate = 40.7/32.7/155 mK, Still = 1.28 K / 100 μbar, G1/G2 = 225/205 mbar, 1K Pot = 1.55 K / 5.5 mbar, MB = 75.6%.
Boiloff rate: good. Released pressure at 10min and 30min yesterday after filling to 92.2%.
0845 Fill LN2 cold trap bath
0850 All phonon channels look good and baselines are around -0.7, no adjustment necessary after bake.
0850 Flash detector for 30 seconds using flashandflash script. As soon as sequence is finished and tower begins cooling, turn off DIB2 FETs.
0917 With DIB2 FETs turned off, Manually start one 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
0947 Stop data. After randoms finish, zero Qbias. Flash for 30s. Turn off DIB2 FETs after tower starts cooling again.
1013 With DIB2 FETs turned off, Manually start one 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1045 Stop data. After randoms finish, zero Qbias. Flash for 30s. Turn off DIB2 FETs after tower starts cooling again.
1110 All phonon channels and DIB1 charge channels showing pulses.
1113 With DIB2 FETs turned off, Manually start one 30min background series at -6/+6 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.
1145 Stop data. After randoms finish, zero Qbias. Flash for 30s. Turn off DIB2 FETs after tower starts cooling again.
1227 Begin closing V6 to commence warm up procedure.
1233 V6 closed. Close V13B, and turn off He3 pump. Isolate Turbopump. Turn on MC Heater to 1.0mW. IVC pressure reads 1.0nbar.
1258 Tower temp = 1.36K, then jumps up to ~3K.
1310 Tower temp = 3.13K. IVC pressure = 220nbar. Open turbopump to commence pumping on IVC. Turn off MC Heater to let tower start cooling.
1325 Unlike yesterday the 1K Pot went back to oscillating on its own, so no need to open the needle valve more
1340 Tower = 2.3 K and flattish, G1 had peaked at 120 mbar, now 70 mbar and flattish.
1345 Open V13B and turn on 3He pump. G1/G2 settle at 130/115 mbar.
1350 Open V6 to 13.3%, G1/G2 begin to rise. Begin opening V6 in steps.
1405 V6 = 13.8%, Tower = 1.6 K, G1/G2 = 350 mbar, Still (P1) falls into readable range. 1K Pot = 1.55 K / 5.5 mbar, stopped oscillating briefly but then returned, may have emptied but seems to have refilled.
1439 Tower temp = 475mK and dropping. V6 at 15.4%, and G1/G2 are stable at ~305mbar. Open V6 all the way.
1535 Tower = 41.8 mK. G1/G2 = 230/205 mbar and falling slowly. Still = 90 μbar.
Tower has been cooled below Al transition with mu-metal shield at standard position
1550 Adjust Driver Offsets to bring all phonon channels to life. All showing good pulses.
1615 After discussion with Anthony we discovered that another way to turn off FET power is in the ODB: Equipment/Tower01/Settings/DCRC2/LED/Enable15VPower. Enabling/disabling this is the same as writing 0800/0000 to the 30 address in a telnet session. We also learned that this is the LED power too, so that flashing won't work if the FET power is off.
1630 Fill LN2 cold trap full.
1730 Commence overnight bake of 12 hours.