2016/02/24 (Wednesday)
| Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50 | |
| Taking Y-Be data overnight. Last flash at ~7:05. | |
| 0915 | Tower/MC(H35)/MC sensor/Cold Plate = 31.8/28.3/41/153 mK, Still = 1.07 K / 0.085 mbar, G1/G2 = 120/110 mbar, 1K Pot = 1.50 K / 1.9 mbar, Main bath = 43.8% |
| 0920 | Remove Y source from fridge. |
| 0925 | Tweak 1K Pot needle valve open additional 5 degrees. After 15 minutes Pot is at to 1.7 K / 15 mbar, Still at 0.12 mbar, Tower at 31.1 mK |
| 0930 | Fill LN2 cold trap Dewar. |
| 1012 | Attach pi-filter switchboard to DCRC50 with only SQUID bias and QET bias lines filtered (switches 3,4,35,19,7,8,38,23). Repower DCRC50. Zap SQUIDs. |
| 1031 | Perform mini IbIs (Later found to be invalid. See below) on DIB3 in with pi-filter switchboard attached SQUID bias, QET bias lines filtered. Unpower DCRC50. |
| 1142 | There were hints that the above arrangement had lower parasitic power than with all switches on. Redo All switches on test for comparison (Later found to be invalid. See below). Turn on all pi-filter switchboard filters. Repower DCRC50. Zap Squids. |
| 1345 | After mini IbIs for all switches filtered configuration, unpower DCRC50. Noticed that DSUB filter was still attached along with pi-filter switchboard, meaning that this mornings tests are invalid. Time to redo them. |
| 1350 | Attach pi-filter switchboard with all switches ON to DCRC50. Repower DCRC50 and zap SQUIDs. |
| 1430 | Perform mini IbIs on DIB3 with pi-filter switchboard attached and all lines filtered. Unpower DCRC50. Switch off lines so that only SQUID bias and QET bias lines are filtered (switches 3,4,35,19,7,8,38,23). Repower DCRC50. Zap SQUIDs. |
| 1505 | Perform mini IbIs on DIB3 with pi-filter switchboard attached and SQUID bias and QET bias lines filtered. Unpower DCRC50. |
| 1530 | 1K Pot down to 2 mbar, tweak 1K Pot needle valve open additional 5 degrees. |
| 1535 | Switch on filters for QET Return lines (switches 1,13,14,32,17,29,47,48,33,5,9,10,28,36,40,43,44) and SQUID Return lines (switches 20,34,24,39) in addition to QET bias and SQUID bias lines (switches 3,4,35,19,7,8,38,23 from earlier). Reattach pi-filter switchboard to DCRC50, repower DCRC50. Zap SQUIDs. |
| 1605 | Commence LHe transfer (33.0%). |
| 1620 | Perform mini IbIs on DIB3 with pi-filter switchboard attached and SQUID bias/return and QET bias/return lines filtered. Unpower DCRC50. |
| 1640 | Cease LHe transfer (91.1% KNOW). |
| 1650 | Fill LN2 cold trap full. |
| 1655 | Place Cf source inside shield near detector for overnight activation. |
| Release pressure from Main Bath. |
Spreadsheet of Mini-IbIs data