| 1030 | Fill LN2 cold trap full. |
| 1035 | Isolate IGH lines, open V12a, speedivalve for LN2 cold trap 1, V11a, V7 until G1 reads 807mbar. P1: 38ubar. Close V12a, speedivalve, V11a, V7, open V1. G1 drops to 139mbar. |
| 1120 | G1: 99mbar, P1: 4.0mbar. Pump out through V6. |
| 1135 | G1: 90mbar, P1: 0.7mbar. Open V2, V3 to aid in pumping. |
| 1150 | G1: 1.0mbar, P1: 80ubar. Close all IGH valves. |
| 1155 | Perform regular throughput test. Open V7, V11A, V12A, cold trap 1 speedivalve, V3, until G1 rises to 920mbar. Close all valves and open V1. G1 drops to 186mbar then begins rising. A flow of 40mbar/min is observed. |
| 1200 | Pump out gas and begin preparation for cooldown. |
| 1330 | Raise dewar. Pump and flush main bath. Commence pumping on fridge lines with turbopump. |
| 1500 | Commence LN2 transfer. |
| 1700 | G1: 1.5mbar, P1: 24ubar. External pressure sensor attached to He3 pump exhaust lines reads 7.4mbar. |