1045 Mixing chamber temperature 28K, 1K Pot temperature >7K, G1: 1.3mbar, P1: 7ubar, G2: 649mbar. Now that the mixing chamber is above LHe temperatures, recommence pumping out fridge lines with He3 circulation pump by opening gate and condenser line speedivalve.
1130 Fill LN2 cold trap full.
1417 Perform He-3 leak test with mixing chamber temperature of 25 K and 1K Pot temperature at >7 K (He level at -1.0%). Background leak rate of ~1E-11 mbarL/s, with no change in leak rate when opened to IVC. No indication of a He-3 leak.
1513 With a He-3 background leak rate of ~10E-9 mbarL/s, open IVC to leak checker. The leak rate dropped to ~10E-11 mbarL/s. While opening IVC flange the leak rate rose/oscillated. Upon closing the IVC flange the leak rate rose to 8.4E-9 mbarL/s. Overall there seems to be no indication of a He-3 leak.
1550 Switch leak checker to He-4 mode, and get a background leak rate of 1.1E-9 mbarL/s. Opening leak checker to IVC causes a rise in leak rate to 3.5E-5 mbarL/s, which then starts to fall.
1600 He-4 leak rate has reached 1.2E-5 mbarL/s and is still steadily, slowly falling. Stop leak checking and pump on IVC with turbopump. G1=1.5mbar, G2=657 mbar and P1=7 ubar.
1730 With mixing chamber temperature of 23.6 K, Sorb temperature of 22.9 K, isolate IVC from turbopump.
1809 Mixing chamber temperature at 23.5 K, Sorb temperature at 23.4 K, G1=0.3 mbar, G2=664 mbar, P1=9 ubar. Open gate valve and condenser line speedivalve. Fill LN2 cold trap dewar full. Perform throughput test with mixture, where mixture passes through cold trap 1 and V1 is opened once G1 is stable (changes are less than 1 mbar). When G1=531 mbar V1 is opened, with G1 dropping to 207 mbar before rising. Throughput test gives a flow rate of 125 mbar/min. Pump mixture back to dump. After test is completed Sorb temperature is at 22.5 K and mixing chamber temperature is at 23.3 K.
1829 Mixing chamber temperature at 23.3 K, Sorb temperature at 22.9 K, G1=1.9 mbar, G2=663 mbar. Perform throughput test with mixture, where mixture passes through cold trap 1 and V1 is opened once G1 is stable (changes are less than 1 mbar). When G1=535 mbar V1 is opened, with G1 dropping to 208 mbar before rising. Throughput test gives a flow rate of 125 mbar/min. Pump mixture back to dump.
1845 Mixing chamber temperature at 23.2 K, Sorb temperature at 22.8 K, G1=0.7 mbar, G2=663 mbar, P1=7 ubar. Perform throughput test with mixture, where mixture passes through cold trap 1 and V1 is opened once G1 and G2 are equal. When G1=507 mbar V1 is opened, with G1 dropping to 159 mbar before rising. Throughput test gives a flow rate of >130 mbar/min. Pump mixture back to dump.
1914 Start pumping on IVC with turbopump. Close gate and condenser line valves with P1=9 ubar, G1=1.0 mbar, G2=663 mbar.