| 1515 | G1=0.7 mbar, G2=650 mbar, P1=14 ubar. Close all valves on IGH. Open gate valve and V6 to collect mixture still in fridge. |
| 1540 | G2=656 mbar, G1=0.5 mbar, P1= 12 ubar. Close gate valve and V6. Close manual dump valves (just in case), and remove He cold trap from bath and open to P2 (scroll pump speedivalve closed). |
| 1610 | G1=2.2 mbar, P2=5.0 mbar worth of waste collected from He cold trap. G2=650. Open scroll pump speedivalve and pump of He cold trap for several minutes. Isolate cold trap by closing V1 and V2. Pull LN2 cold trap 1 from dewar and open cold trap to P2 (scroll pump speedivalve closed). |
| 1650 | Complete check for ground loops. Found evidence of shorts due to bellow from IVC to turbo pump and hoist cables touching dewar. After correcting these issues, fridge was floated, with 1.6 mV between fridge frame and orange ground socket. |
| 1700 | P2=8 mbar or waste collected from cold trap 1. Pump on cold trap 1 and He cold trap. Do a quick (5 minutes) spray with heat gun on each. |
| 1720 | Stop pumping on cold traps and put them back in their baths, fill LN2 cold trap dewar full. Start the 1K Pot. G1=1.8 mbar, G2=652 mbar and P1=34 ubar. Prepare to start condensing procedure. Start LHe transfer (26.3%). |
| 1745 | Close V9 with 302 mbar left in dump (circulate 350 mbar). |
| 1750 | G1=89 mbar, G2=68 mbar. Start circulating procedure. |
| 1602 | Finish circulating procedure. G1=149 mbar, G2=160 mbar, P1=0.4 mbar, mixing chamber temperature at 1.04 K and all values are dropping. |
| 1810 | End LHe transfer (79.1%) |
| 1815 | Lower 1K Pot temperature to 1.52 K. |